Civil Method Statement for Pond Work

This civil Method Statement defines the procedure to carry out the pond work as per requirements in project specifications to ensure the safety and quality of the work. Method statement covers excavation activity, rebar installation, formworks, concrete pouring, curing of concrete, formwork dismantling, finishing, and other civil work base on civil work item list. Subcontractor… Read More »

Sample Forms & Checklists For HVAC Installation Testing & Commissioning

You can download the sample forms and checklists for different activities which you can then reuse and customize as per your requirements. Below we have given list of checklists which you can download in one go by clicking the download link given below at the end of the list. Installation-of-HVAC-Duct-Work-System Installation-of-Internal-Lighting Installation-of-Lightening-Protection-System Installation-of-HVAC-Damper-Louver-and-Accessories Installation-of-Fans-and-Accessories Installation-of-Exposed-Conduit… Read More »

GRP Pipe Installation and Lamination Method Statement

This procedure defines the work method for installation and lamination of GRP Pipe for any kind and size of the project. The purpose of this procedure is to set out the requirements and methods for installation of GRP glass reinforced plastic pipe including the lamination in detail. Below method statement shall be followed in compliance… Read More »

Access Control System Installation

This access control system installation method statement provides steps for the installation of access control security system in order for operatives to understand the work to be executed, how it is to be executed while making references to other technical standards and relevant national/international standards. Method statement covers installation of ACS access control system including brackets,… Read More »

Method statement for Aluminium Windows and Doors Installation Including Glazing

Below is a precise method statement for the installation of aluminium windows and doors including the glazing works. The method of statement describes the sequence of events from the receipt of the order through the completion of the Aluminium windows and doors related glazing work. All work will be carried out in accordance with project… Read More »

Aluminum Stair Railing Handrail Fabrication Method

Below is a brief and step wise method for fabrication of any kind of aluminum stair railing. If you are working in a company that provides aluminum and glass fabrication services, then this work instruction is very useful for your new people. This step wise guide will help the new fabricators and engineers to understand… Read More »