The purpose of this Method Statement is to define the procedures, responsibilities, safety requirements, quality control measures, installation methodology, testing requirements, inspection activities, and acceptance criteria for the installation and testing of sanitary ware fixtures within the project.
The objective is to ensure that all sanitary fixtures are installed in accordance with approved shop drawings, project specifications, manufacturer recommendations, accessibility requirements, and applicable plumbing codes, ensuring proper operation, hygiene, durability, water efficiency, and user safety.
Download Method Statement For Installation Of Plumbing Fixtures, Sanitary Wares & Accessories.
- Method Statement
- Checklist for Installation
- Inspection & Testing Plan
- Risk Assessment
Below is the list of files that are included in download package.
Download Method Statement with Checklists, ITP and Risk Assessment.


