The purpose of this Method Statement is to define the procedures, responsibilities, quality requirements, safety precautions, inspection criteria, and installation methodology for Air Separators in HVAC chilled water, condenser water, heating water, and closed-loop hydronic systems.
The objective is to ensure that Air Separators are installed safely, correctly, and in accordance with approved shop drawings, project specifications, manufacturer recommendations, and applicable international standards to facilitate efficient removal of entrained and dissolved air from piping systems, prevent air locking, reduce corrosion, improve system efficiency, and ensure long-term operational reliability.
Download Method Statement For Installation of Air Separators.
The Download Package Contains:
- Method Statement
- Checklist for Air Separator Installation
- Inspection & Testing Plan
- Risk Assessment
The files are in Word/Excel formats and instantly available after the payment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
Below is the list of files that are included in download package.

Download Method Statement with Checklists, ITP & Risk Assessment.
Discover more from Method Statement HQ
Subscribe to get the latest posts sent to your email.


