Plumbing Method Statements

Hot Water Calorifier Testing and Commissioning Method Statement

Hot Water Calorifier Installation Testing and Commissioning Method Statement

This method statement is applicable for the installation testing and commissioning of hot water calorifier or water heater for any kind of building or projects. Arrange below tools before start of the work: Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to […]

Hot Water Calorifier Installation Testing and Commissioning Method Statement Read More »

Plumbing Method Statements, Testing & Commissioning
Water Filtration System Testing and Commissioning Method Statement

Water Filtration System Testing and Commissioning Method Statement

This method statement is applicable for Testing & Commissioning of Multimedia Water Filtration System which is part of domestic water supply system. The water filtration system is used to filter the suspended particles in the water and mostly in the residential and commercial building these are installed in the mechanical floor for the purpose of

Water Filtration System Testing and Commissioning Method Statement Read More »

Plumbing Method Statements, Testing & Commissioning
Disinfection and Flushing of Water Mains

Disinfection and Flushing of Water Mains

Purpose of this plumbing method statement is to ensure that disinfection and flushing of water mains and related pipe lines are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented for the

Disinfection and Flushing of Water Mains Read More »

Plumbing Method Statements, Testing & Commissioning
Water Booster Pump Installation Testing and Commissioning Method Statement

Water Booster Pump Installation Testing and Commissioning Method Statement

Below is a precise method of statement for water pump or booster pump installation including the testing and commissioning steps. Make sure that proper clearance is available from civil side before commencement of water pump installation works. Ensure that the work area is clean and safe for carrying out the activities. Also prior to start

Water Booster Pump Installation Testing and Commissioning Method Statement Read More »

Plumbing Method Statements, Testing & Commissioning

Method of Statement For Installation of Compressed Air Piping System for Chillers

1. PURPOSE This method of statement covers the on construction project site installation of the compressed air piping system for the operation of the chillers. This method statement covers following type of works: Power Plant Compressed Air Systems Factory assembled packaged air compressor complete with: –  Rotary screw air compressor –  Receiver –  Filtration facilities – 

Method of Statement For Installation of Compressed Air Piping System for Chillers Read More »

Plumbing Method Statements
Underground Drainage Pipe Installation Method Statement

Underground Drainage Pipe Installation Method Statement

The purpose of this plumbing method statement is to describe the methodology for underground laying of UPVC pipes as per the contract specifications and approved drawings, including the backfilling for the site facilities and to detail the steps to be taken to meet the quality and HSE requirements of the project. Method statement is applicable

Underground Drainage Pipe Installation Method Statement Read More »

Plumbing Method Statements
Method Statement for Condensate Drain Piping Installation Insulation & Testing (UPVC + GI)

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI)

This method statement covers on site installation of all condensate UPVC pipes for fan coils drains and galvanized pipework for AHU drains, including supports, expansion and anchor points for the condensate drainage system and insulation of the galvanized steel and upvc pipework. The mechanical method statement defines the method that will be used to ensure

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI) Read More »

Plumbing Method Statements, Testing & Commissioning