Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Sequence of Operation for Electrical, Low Current & ELV Systems

Below is sequence of operation for different systems which is configured for building management system during testing and commissioning phase of a project. This page will help commissioning engineers to understand how the sequence of operation shall be checked. Fire Alarm Panels Sequence Location: Fire Alarm Panels: Various Locations (refer to Fire Alarm Layout) Each Fire

Sequence of Operation for Electrical, Low Current & ELV Systems Read More »

Building Management System, Electrical Method Statements
Chiller Plant Manager CPM Field Devices Installation Methodology

Chiller Plant Manager CPM Field Devices Installation Methodology

This hvac method statement covers the supply & installation of chiller plant manager field devices in line with project requirements as indicated in the shop drawings, project specifications and manufacturer’s installation instructions. Following tools shall be arranged before starting the job. Mechanical Tool Box Electric Drill Machine Step Ladders Threading Machine Solvent Cement Electric welding

Chiller Plant Manager CPM Field Devices Installation Methodology Read More »

HVAC Method Statements
Installation of Air Handling Units AHU & FAHU

Sequence of Operation for Variable Volume Type Fresh Air Handling Units

Sequence of operation is very important part of testing and commissioning of equipment’s. This becomes more important when matter of mechanical systems is considered. SOO is technical document that is developed based upon the mechanical systems performance and operation requirements. Sequence of operation is part of building management system BMS submission documents. BMS covers the

Sequence of Operation for Variable Volume Type Fresh Air Handling Units Read More »

HVAC Method Statements, Testing & Commissioning

Gypsum Board Ceiling Installation Method Statement

Below is best method statement for gypsum board ceiling that can be useful for any kind of project submission and site works. The purpose of this ceiling method statement is to ensure that the gypsum board suspended ceiling and related activities are executed safely, in accordance with the contract requirements and that all quality assurance

Gypsum Board Ceiling Installation Method Statement Read More »

Method Statement for Civil Works

Tensile Fabric Shades Fabrication and Installation Methodology

Below is a precise method statement that covers the fabrication and installation of fabric components of the tensile fabric shades that includes: Shades over outdoor playgrounds Shades over swimming pool Car park shades Fabric roof over cafeteria This procedure shall be read in conjunction with project specifications wherever applicable. Below is the equipment required for

Tensile Fabric Shades Fabrication and Installation Methodology Read More »

Construction Method Statements, Method Statement for Civil Works

Concrete Casting, Placement, Curing and Defect Rectification Method

Below is a brief method statement that describes the practices and methods with regards to concrete placing, curing and defect rectification. Below is list of reference documents useful for this method statement. Contract specification cast in place in concrete Hazard Analysis table Inspection and Test Plan BS 8110 Concrete Placement: Complete all quality control checks

Concrete Casting, Placement, Curing and Defect Rectification Method Read More »

Construction Method Statements, Method Statement for Civil Works

Installation of Electrical Systems for HVAC Wild Air Cooling of Projects

This method statement details the method related to sequence of installation of electrical works in order to achieve the wild air cooling for under construction building of large projects. The installation of electrical works such as panel installation comprises the following activities. Site Clearance. Installation of necessary containment system. Area clearance for Electrical Room, Plant

Installation of Electrical Systems for HVAC Wild Air Cooling of Projects Read More »

HVAC Method Statements, Method Statements