Testing & Commissioning

Variable Air Volume VAV Installation Testing and Commissioning Method Statement

Variable Air Volume Installation Testing and Commissioning Method Statement

This method Statement shall cover the Supply, Installation, testing and commissioning of VAV Variable Air Volume System in line with project requirements as indicated in the approved HVAC shop drawings, specifications and VAV manufacturer’s instructions. Arrange following tools before starting the VAV installation and testing activities: Mechanical Tool Box Electric Drill Machine Step Ladders Threading […]

Variable Air Volume Installation Testing and Commissioning Method Statement Read More »

HVAC Method Statements, Testing & Commissioning

TESTING OF CHILLED WATER PIPES & FITTINGS – HOW TO GUIDE

TESTING OF CHILLED WATER PIPES & FITTINGS Care will be taken to avoid all the equipment, apparatus, devices to a pressure exceeding its prescribed test pressure as obtained from its name plate data or product catalogs. All equipment, apparatus and devices that might be damaged by the test pressure shall be isolated, removed, bypassed or

TESTING OF CHILLED WATER PIPES & FITTINGS – HOW TO GUIDE Read More »

HVAC Method Statements, Testing & Commissioning
Disinfection and Flushing of Water Mains

Disinfection and Flushing of Water Mains

Purpose of this plumbing method statement is to ensure that disinfection and flushing of water mains and related pipe lines are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented for the

Disinfection and Flushing of Water Mains Read More »

Plumbing Method Statements, Testing & Commissioning
Water Booster Pump Installation Testing and Commissioning Method Statement

Water Booster Pump Installation Testing and Commissioning Method Statement

Below is a precise method of statement for water pump or booster pump installation including the testing and commissioning steps. Make sure that proper clearance is available from civil side before commencement of water pump installation works. Ensure that the work area is clean and safe for carrying out the activities. Also prior to start

Water Booster Pump Installation Testing and Commissioning Method Statement Read More »

Plumbing Method Statements, Testing & Commissioning
Chilled Water Dosing System Dosing Pot Installation and Testing Method Statement

Chilled Water Dosing System Dosing Pot Installation and Testing Method Statement

The purpose of this method statement is to define the steps to implement the correct practices for the installation of chemical dosing system (pot) for chilled water piping. By following this procedure contractor shall ensure that the performance of the chemical dozing system and equipment complies with the project requirements and serves the intended function

Chilled Water Dosing System Dosing Pot Installation and Testing Method Statement Read More »

HVAC Method Statements, Testing & Commissioning
Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement

Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement

This method statement is applicable for the Testing & Commissioning of Fan Coil Units for the project as mentioned in the project specifications & approved shop drawings. Before commencement of FCU testing & commissioning activity, the supervisor must ensure that pre-commissioning of the FCU is complete and approved. Also make sure that all Installations &

Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement Read More »

HVAC Method Statements, Testing & Commissioning
Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Method Statement for Testing & Commissioning of Air Handling Units AHU & FAHU

This page presents precise mechanical method statement that covers ahu testing and commissioning procedure. A full method statement shall have many other sections and details depending upon the type and size of units and projects.  Prior to testing & commissioning ensure that all the sections of the Air Handling Units are thoroughly cleaned. In case

Method Statement for Testing & Commissioning of Air Handling Units AHU & FAHU Read More »

HVAC Method Statements, Testing & Commissioning