Bored Pile (Cast-in-Situ) Construction Method Statement

Bored Pile (Cast-in-Situ) Construction Method Statement

The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated risks involved, develop and implement adequate control measures and to provide a safe […]

Bored Pile (Cast-in-Situ) Construction Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Precast Post Tensioned Beam Installation Procedure

This civil method statement is prepared to state the proposed construction method for prestressing works and shall be, upon approval by the consulting engineer, distributed to all parties concerned so that the prestressing works can be carried out with the same information. The prestressing systems is STRONG FORCE (M) Multi Strand Bonded System using 15.24mm

Precast Post Tensioned Beam Installation Procedure Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
Cathodic Protection System for Storage Tanks Installation Method Statement

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure

Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the best quality workmanship for the scope of work. All project site, QA/QC and

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure Read More »

Construction Method Statements, Method Statement for Civil Works, Method Statements, Plumbing Method Statements, Stainless Steel Fabrication
jointing procedure using solvent cement

Installation Method Statement for Water Feature Piping Equipment and Accessories

Below is a brief method statement that covers installation of water feature equipment’s and accessories, in accordance with project specifications and manufacturer’s installations. MEP project manager, engineers site supervisors shall have overall responsibility for adherence to the approved method statement, project quality and site safety plan. They shall ensure that adequate resources and personnel are

Installation Method Statement for Water Feature Piping Equipment and Accessories Read More »

Plumbing Method Statements
Method Statement for Structured Cabling System Installation

Method Statement for Structured Cabling System Installation

This method of statement covers the nature and type of work for structured cabling installation as per approved material submittal and site requirements for the construction project. Method statement also covers frequency of which the inspections are to be carried out. Any contractor to carry out works under main contractor must comply with this method

Method Statement for Structured Cabling System Installation Read More »

Electrical Method Statements, Method Statements
Pressure Vessel Steel Tank Fabrication Welding General Steps

Pressure Vessel Steel Tank Fabrication Welding General Steps

Below method covers the erection of the tank by joining the top and bottom portion through the welding procedure. Prior to the commencement of the works the lifting supervisor must ensure that all site personnel are adequately briefed on the contents of safework method statement. This safety briefing shall take the form of a short

Pressure Vessel Steel Tank Fabrication Welding General Steps Read More »

Construction Method Statements, Method Statements, Stainless Steel Fabrication

General Civil Work Method Statement for Roads & Building Construction

Setting Out the Layout Refer to the final layout drawing prepared with reference to the actual demarcation, set back adjustments, final levels and other development works. Check if the site is cleaned and leveled properly by cutting or filling. Start the layout with the help of ‘Total Station’ or any other survey instrument as given

General Civil Work Method Statement for Roads & Building Construction Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Method of thermal insulation and Lagging for Pipe Elbow

Method Statement for Installation of Thermal Insulation on Pipes

Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause corrosion problems or process problems, for example the outdoor piping, fitting and equipment.

Method Statement for Installation of Thermal Insulation on Pipes Read More »