Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Excavation Work Guidelines for Irrigation and Water Supply Projects

Excavation Work Guidelines for Irrigation and Water Supply Projects

This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is responsible in ensuring the implementation of construction procedure and method statement, supervising the […]

Excavation Work Guidelines for Irrigation and Water Supply Projects Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works

Purpose of this method statement is to define the fixing of the water stop in the sub structure concrete works as per the manufacturer’s requirements and drawings, considering all the necessary safety and quality aspects of the work activities. Project manager shall ensure that the water stop works are carried out in accordance with company

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
Concrete Bulging Repair Method Statement

Concrete Bulging Repair Method Statement

This civil method statement details general procedures to be followed for repairing work of concrete bulging elements by using a suitable material i.e. BASF’s Emaco S88C T. The method covers preparatory works, bulging repairs and curing. The scope of this civil work method statement is for rectification of the bulges in concrete in which chipping

Concrete Bulging Repair Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
Method Statement for Installation of Fire Stop Work

Fire Stop Work Installation & Application Method Statement

Scope: This method statement covers the installation of Hilti Fire stop Wok which is also applicable for any other brand of fire stop system by integrating their specific requirements for effective fire stop application. References:  Approved Project Quality Plan Approved Project HSE Plan Approved Material Management Plan Material approval for Fire stop work Technical Literature

Fire Stop Work Installation & Application Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Fire Suppression System, Method Statement for Civil Works

Method of Statement for Good Housekeeping in Construction Site

This standard document provides guidance on how to maintain a tidy place of work, free from avoidable hazards and an orderly working environment. Scope of the procedure covers all projects under the supervision of the organization. Project head along with discipline engineers including HSE are overall responsible for the implementation of this housekeeping method. Good

Method of Statement for Good Housekeeping in Construction Site Read More »

Construction Method Statements, Method Statements, Occupational Health and Safety
Method Statement for Casting of Capping Beam for Shoring Piles

Method Statement for Casting of Capping Beam for Shoring Piles

The purpose and aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the capping beam work in compliance to standard and good practice at all stages and activities in the construction of capping beam for shoring works. This method statement applies to the construction of

Method Statement for Casting of Capping Beam for Shoring Piles Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

This plumbing method statement covers the nature and type of work for drainage outlets stainless steel shower gullies for the project as per site requirements. Method statement also covers frequency of which inspections are to be carried out. All documentary requirements for the installation works will be submitted for approval of consultant and this will

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements
Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter

Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter

The objective of this method statement is to set down the procedures that are involved in the safe erection, operation and dismantling of a slip form shuttering, applicable for the construction of core for the project building. Roles and Responsibilities Project manager has overall responsibility for the implementation of this method statement and to ensure

Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Project Planning
error: Content is protected !!
Scroll to Top