Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Method Statement for Swimming Pool and Jacuzzi Installation

Method Statement for Swimming Pool and Jacuzzi Installation

This construction methodology for the swimming pool and jacuzzi installation consists of descriptive details and the installation sequence for guiding the employees of a pool installation company. Scope of work covers the supply and installation of the Swimming Pool and Jacuzzi. All materials used are in accordance with contract specifications and shall be submitted for […]

Method Statement for Swimming Pool and Jacuzzi Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Underground Drainage Pipe Installation Method Statement

Underground Drainage Pipe Installation Method Statement

The purpose of this plumbing method statement is to describe the methodology for underground laying of UPVC pipes as per the contract specifications and approved drawings, including the backfilling for the site facilities and to detail the steps to be taken to meet the quality and HSE requirements of the project. Method statement is applicable

Underground Drainage Pipe Installation Method Statement Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements
dewatering in construction well point system

Well Point Dewatering System Method Statement

The purpose of this method statement is to define the procedure for sequence of works for dewatering in construction works at site to complete the excavation from the existing levels down to the formation level considering all safety and quality requirements. This method statement covers dewatering works at construction site having 6 meter basement structure,

Well Point Dewatering System Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
HVAC System Volume Control & Fire Damper Installation Method Statement

HVAC System Volume Control & Fire Damper Installation Method Statement

Unless otherwise specified, all the dampers and duct accessories installation shall be according to the approved shop drawings and contract mechanical specifications. Drawings, plans, schematics and diagrams indicate general location and arrangement of ductworks, install the dampers as indicated unless deviations to the layout are approved on coordination drawings. This duct accessories and dampers installation

HVAC System Volume Control & Fire Damper Installation Method Statement Read More »

HVAC Method Statements, Method Statements
Method Statement for Condensate Drain Piping Installation Insulation & Testing (UPVC + GI)

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI)

This method statement covers on site installation of all condensate UPVC pipes for fan coils drains and galvanized pipework for AHU drains, including supports, expansion and anchor points for the condensate drainage system and insulation of the galvanized steel and upvc pipework. The mechanical method statement defines the method that will be used to ensure

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI) Read More »

Method Statements, Plumbing Method Statements, Pressure Testing, Testing & Commissioning
Method of Statement for Installation of Power / Electrical Bus bar

Method of Statement for Installation of Power / Electrical Bus bar

Busbars installation shall be done in accordance with approved shop drawings and properly coordinated with Site Engineer’s for the exact locations and levels.  Before starting the installation of power electrical busbar following tools shall be arranged: Tower Crane / Fork Lift for transporting Busbar Chain Block Pulley (Suitable Capacity) Portable hand tolls Portable Drilling Machine

Method of Statement for Installation of Power / Electrical Bus bar Read More »

Electrical Method Statements, Method Statements
Water Leak Detection System Testing & Commissioning Method of Statement

Water Leak Detection System Testing & Commissioning Method of Statement

This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case of any contradictory matters that may arise. Purpose of this method is to

Water Leak Detection System Testing & Commissioning Method of Statement Read More »

Building Management System, Electrical Method Statements, Method Statements, Plumbing Method Statements, Testing & Commissioning
Pedestrian Walkway Concreting - Broom Finish Concrete

Pedestrian Walkway Concreting – Broom Finish Concrete

The purpose of this concreting method statement is to define the guidelines for the preparation of the concreting work for pedestrian walkway (broom finish) and to ensure the safe execution of all the concrete works during construction phases of the project so as to eliminate the risk of injury or damage to personnel, equipment and

Pedestrian Walkway Concreting – Broom Finish Concrete Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements