Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Method of Statement For Installation of Compressed Air Piping System for Chillers

1. PURPOSE This method of statement covers the on construction project site installation of the compressed air piping system for the operation of the chillers. This method statement covers following type of works: Power Plant Compressed Air Systems Factory assembled packaged air compressor complete with: –  Rotary screw air compressor –  Receiver –  Filtration facilities –  […]

Method of Statement For Installation of Compressed Air Piping System for Chillers Read More »

Plumbing Method Statements
Method of thermal insulation and Lagging for Pipe Elbow

Method Statement for Installation of Thermal Insulation on Pipes

Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause corrosion problems or process problems, for example the outdoor piping, fitting and equipment.

Method Statement for Installation of Thermal Insulation on Pipes Read More »

HVAC Method Statements, Method Statements

Kitchen Exhaust Ducting Installation Method Statement

This method statement covers on site installation of pre-fabricated ductwork system for kitchen exhaust ducting. Procedure defines the method that will make sure that prefabricated kitchen exhaust ducting including support/bracketing, in line equipment installation and final connections are correct and acceptable, and conforms to the contract documents and specifications. Construction/ Project Manager is overall responsible

Kitchen Exhaust Ducting Installation Method Statement Read More »

HVAC Method Statements, Method Statements
Method Statement For Switchgear Installation Of MV LV HV Switchgear Panels

Switchgear Installation Method Statement – MV LV HV Switchgear Panels

1.0 PURPOSE The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for medium voltage switchgear panel installation & its accessories through the guidelines contained herein so as to ensure that the job execution complies with specifications and serves the intended function to satisfactory level.

Switchgear Installation Method Statement – MV LV HV Switchgear Panels Read More »

Electrical Method Statements
Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Method Statement for Testing & Commissioning of Air Handling Units AHU & FAHU

This page presents precise mechanical method statement that covers ahu testing and commissioning procedure. A full method statement shall have many other sections and details depending upon the type and size of units and projects.  Prior to testing & commissioning ensure that all the sections of the Air Handling Units are thoroughly cleaned. In case

Method Statement for Testing & Commissioning of Air Handling Units AHU & FAHU Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning

Chilled Water Pipe Insulation Method Statement

1. Purpose This method statement covers on site installation of thermal insulation for the complete chilled water piping system. 2. Scope This procedure is applicable for insulation of all supply and return mains, headers, branches, risers, drips, run-outs, pump suction and discharge, pipework, fittings, flanges, valves, expansion and movement devices, flexible connections associated with the

Chilled Water Pipe Insulation Method Statement Read More »

HVAC Method Statements
Motor Control Centre MCC Panel Installation Method Statement

Motor Control Centre MCC Panel Installation Method Statement

Below is a precise electrical method of statement for the installation of MCC panels. All components / materials received at site shall be inspected to ensure compliance with the approved material submittals and project electrical specifications Any discrepancies / damages shall be notified immediately for further action. Any factory test reports shall be checked and

Motor Control Centre MCC Panel Installation Method Statement Read More »

Electrical Method Statements, Method Statements
Method Statement for Wall Panel Installation

Method Statement for Wall Panel Installation

The purpose of this procedure is to define how the wall panel installation and fabrication at a construction site shall be carried out under the controlled conditions. Scope of work under this method statement covers the detailed procedure to be followed for fabrication, supply and installation of wall panels as per approved shop drawings and

Method Statement for Wall Panel Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
error: Content is protected !!
Scroll to Top