Electrical Method Statements

Electrical method statement is used for safe implementation and construction of electrical works.

Before performing any electrical engineering activity one must prepare a method statement for electrical work that will describe scope of work, references, responsibilities, required materials and resources.

The main section of an electrical method statement for construction shall contain steps for installation and construction of the electrical works and components.

We are providing editable method statement swms packages, you can check a sample of  free electrical method statement and after that decide about downloading the full package.

In addition to method statement you shall find inspection and testing plan, inspection/testing checklists and risk assessments for doing the work as part of method statement for electrical works.

Below you can find complete set of electrical method statements and also you can search from the top left section of this page.

In addition you can also find complete set of editable electrical method statement in the form of editable files which are in Word / Excel formats and you only need to insert logo of your company and it is ready for submission and approval.

Click here to download electrical method statements.

Installation Procedure for Ticketing Dispenser

Ticketing dispenser shall be installed in retail parking entry point. Access to the car park will be granted via ticketing dispenser with bar code parking ticket. Foundations shall be prepared as per the recommendations of manufacturer. The foundation dimensions shall be of HxWxD: 600x600x600mm. The concrete to be a design mix in accordance with BS […]

Installation Procedure for Ticketing Dispenser Read More »

Construction Method Statements, Electrical Method Statements, Method Statements

Installation Procedure for Vehicle Induction Loop System

The preformed or saw-cut vehicle induction loop shall be buried in Entry and Exit drive lanes as per the approved shop drawings and the project requirements. The loop shall be a continuous run of wire that enters and exits from the same point and end up at the loop detector which powers up the loop.

Installation Procedure for Vehicle Induction Loop System Read More »

Construction Method Statements, Electrical Method Statements, Method Statements

Installation Method Statement Procedure for Car Park Boom & Barrier Arms

The Vehicle loop cables shall be laid on the drive lane for entry & exit locations, to detect vehicle presence at drive lanes. In addition, safety loops shall detect vehicle exit on the drive lane to command barrier to lower down its arm. The Vehicle loop detectors’ cables shall be pulled up to barrier locations

Installation Method Statement Procedure for Car Park Boom & Barrier Arms Read More »

Construction Method Statements, Electrical Method Statements, Method Statements

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves

SCOPE OF WORK: This Method Statement describes the procedure for repairing the damaged outer jacketing of cables using wrap around heat shrinkable sleeves. TOOLS  Cable preparation tools Cable manufacturer approved solvent Clean, lint free clothes Burning Torch Electrician’s tape Installation tools MATERIALS REQUIRED: The wrap around heat shrinkable cable sleeves used shall be as per approved

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves Read More »

Construction Method Statements, Electrical Method Statements, Method Statements

Sequence Of Operation For Electrical, Low Current & ELV Systems

Fire Alarm Panels Sequence Location: Fire Alarm Panels: Various Locations (refer to Fire Alarm Layout) Each Fire alarm panel will be monitored by the DDC controller to provide a system healthy, fault and alarm. All information shall be displayed on the BMS Supervisor. All MCC and DDC control panels will be linked to the Fire Alarm

Sequence Of Operation For Electrical, Low Current & ELV Systems Read More »

Building Management System, Construction Method Statements, Electrical Method Statements

Testing and Commissioning Procedure For Structured Cabling System SCS

Below is a complete method statement that can be followed for performing testing & commissioning of structured cabling system including voice, telephone and data systems. Copper Cable Testing & Commissioning Method Statement Overview: Characterizing cabling provides useful data for the support of future equipment application. The verification of the transmission performance of cable plant through field

Testing and Commissioning Procedure For Structured Cabling System SCS Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning