Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Earthworks Method Statement

Earthworks Method Statement

This method statement for earthworks defines requirements for civil work related activities, but it doesn’t cover the earthwork activities related to underground piping, conduits and ducts which are covered under different earthworks method statements. All the earthworks shall be done in accordance with applicable standards, specifications, regulations and Client’s reference documents for the project. Terms […]

Earthworks Method Statement Read More »

Civil Works Method Statements
Micro Pile Installation and Pile Test Method of Statement

Micro Pile Installation and Pile Test Method of Statement

Scope of this work method statement shall apply on the reinforced concrete works and the objective is to define and establish the work method of statement for the reinforced concrete work for the installation of micro pile. The piling installation work shall be done in compliance with construction drawings and contract specifications. Following personnel are

Micro Pile Installation and Pile Test Method of Statement Read More »

Civil Works Method Statements
Scaffolding Method Statement

Scaffolding Method Statement

Below is a precise method statement for scaffolding installation for any kind of project. The following method statement is written to provide a safe and efficient system of work for the installation of general working scaffold to all areas of construction sites within the project. It will also cover all scaffold adaption’s to general scaffold

Scaffolding Method Statement Read More »

Civil Works Method Statements, Occupational Health and Safety
roadworks sub base and road base compaction

Structural Excavation and Backfill General Tips

All necessary clearing and grubbing and topsoil excavation (where necessary) will be completed prior to the beginning of the excavation. The location will be demarcated to show the limits and depths of the excavation. Disturbing and spoiling material and vegetation outside of the expropriation limits will be avoided to the extent possible. The excavation will

Structural Excavation and Backfill General Tips Read More »

Civil Works Method Statements
Diaphragm-Walls-Requirements-and-design

Earth Retention Shoring System for Excavations – Part 2 of 2

Diaphragm & Guide Walls Requirements The design and construction of the diaphragm wall including all its associated works such as guide walls, anchors, etc., shall be the responsibility of the Contractor and shall take into account the actual site, ground conditions, the equipment to be used and the local authorities requirements/regulations. The design and construction of

Earth Retention Shoring System for Excavations – Part 2 of 2 Read More »

Civil Works Method Statements, Technical Articles
Pile wall requirements

Earth Retention Shoring System for Excavations – Part 1 of 2

The work specified herein includes the design, documentation, furnishing, and installation of earth retention systems for excavations.  The earth retention system shall be either singular or multiple stages comprised of soldier piles and laggings, sheet pile wall and bracing, raker or timber sheet pile wall bracing or secant piling bracing and tie-back systems or cantilever

Earth Retention Shoring System for Excavations – Part 1 of 2 Read More »

Civil Works Method Statements, Technical Articles