Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories

This method statement covers the fan installation including accessories. The procedure defines the method used to ensure the exhaust fan installation has been carried out as per project contract requirements and best practices. It also gives details of how the mechanical work will be carried out and what health and safety requirements are implemented on […]

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories Read More »

HVAC Method Statements
Cathodic Protection System for Storage Tanks Installation Method Statement

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure

Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the best quality workmanship for the scope of work. All project site, QA/QC and

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure Read More »

Civil Works Method Statements
jointing procedure using solvent cement

Installation Method Statement for Water Feature Piping Equipment and Accessories

Below is a brief method statement that covers installation of water feature equipment’s and accessories, in accordance with project specifications and manufacturer’s installations. MEP project manager, engineers site supervisors shall have overall responsibility for adherence to the approved method statement, project quality and site safety plan. They shall ensure that adequate resources and personnel are

Installation Method Statement for Water Feature Piping Equipment and Accessories Read More »

Plumbing Method Statements
Method Statement for Structured Cabling System Installation

Method Statement for Structured Cabling System Installation

This method of statement covers the nature and type of work for structured cabling installation as per approved material submittal and site requirements for the construction project. Method statement also covers frequency of which the inspections are to be carried out. Any contractor to carry out works under main contractor must comply with this method

Method Statement for Structured Cabling System Installation Read More »

Electrical Method Statements

Construction Project Quality Plan Basic Requirements & Template

Below are basic sections that can form a good project quality plan for construction sites. 1. Introduction Construction Quality Control Plan (CQCP) for any kind of project is implemented to ensure that construction procedures are performed in compliance with the plans and specifications under the contract requirements. The CQCP provides means to maintain effective quality

Construction Project Quality Plan Basic Requirements & Template Read More »

Quality & Project Management, Templates Reports & Forms

Manual Handling Manual Lifting Techniques and Safety Procedure

This health and safety procedure provides guidance and direction in identification of potential manual handing and lifting issues and prevention measures to help eliminate the risk of injury. Procedure addresses safety instructions for both projects and offices of the company, additional control measures may be required depending on project and local government requirements. Manual Handling

Manual Handling Manual Lifting Techniques and Safety Procedure Read More »

Occupational Health and Safety, Risk Assessment
error: Content is protected !!
Scroll to Top