SOA of AHU

Sequence of Operation for Single Zone Variable Volume Type Recirculating Air Handling Units AHU

Below sequence of operation is for single zone Variable Volume type recirculating Air Handling Units AHU’s. The system shall be variable volume package Fresh Air Handling Unit. The covering of the sequence shall consist of: Supply Side coverage of scope Exhaust Side coverage of equipment’s Sequence of Operation The Variable Volume re-circulating type AHUs for single zone […]

Sequence of Operation for Single Zone Variable Volume Type Recirculating Air Handling Units AHU Read More »

Building Management System, Testing & Commissioning

Drainage Pipe Installation & Hydrostatic Testing Method of Statement

When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required for sizes below 160mm. Drainage pipes shall not be stored under direct sunlight

Drainage Pipe Installation & Hydrostatic Testing Method of Statement Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements

Method Statement for Installation of GI Ducts for HVAC System

This mechanical hvac method statement covers the installation of GI ductwork. Procedure defines the method used to ensure GI ducting installation has been carried out as per contract requirements and best practices. The method statement gives details of how the work will be carried out and what health and safety issues and controls are involved.

Method Statement for Installation of GI Ducts for HVAC System Read More »

Duct Works, HVAC Method Statements
Project Manager Responsibilities

PMC Project Manager Roles & Responsibilities

TYPICAL PROJECT RESPONSIBILITIES FOR A PROJECT MANAGEMENT COMPANY: THE PROJECT MANAGER The Project Manager shall perform the Services strictly in accordance with the skill, care and diligence reasonably to the expected of a professional international project management consultant experienced in the provision of like services with due regard to protecting and representing the Client’s interests.

PMC Project Manager Roles & Responsibilities Read More »

Quality Management, Technical Articles
Reinforcement-Bars-requirement-sizes-and-weight

Concrete Reinforcement Standard Requirements and Specifications

All reinforcement for use in the permanent works shall be specified on the drawings and shall comply with the Standards specified below. Deformed bars shall have Type 2 bond classification. BS or American Standards are applicable as mentioned but not limited to the following. BS 4449: Carbon Steel Bars for Reinforcement of Concrete BS 8666-2000, BS EN

Concrete Reinforcement Standard Requirements and Specifications Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Loading-Platform-Construction-Method-Statement

Loading Platform Erection, Assembling and Installation Method Statement

The Scope of this method statement covers all operations and associated activities involved in safe and efficient erection and construction of Loading Platforms including assembling and installation for efficient and effective utilization of Platforms in execution of project works. Following tools / equipment shall be arranged. JCB Tower crane Props / jacks Loading platform (Pre

Loading Platform Erection, Assembling and Installation Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Method statement for installation of hoist for construction of building

Method Statement For Installation & Erection Of Building Hoist

Hoist is a Rack and Pinion lift that is useful on construction site for transportation of personnel and materials. It is installed and dismounted conveniently and can grow as high as the building grows in height. Hoist has reliable electrical and mechanical safety device. It is efficient and safe vertical transporting equipment. Following tools shall

Method Statement For Installation & Erection Of Building Hoist Read More »

Civil Engineering Methods, Method Statement for Civil Works
method statement for Cementitious Water proofing

Method Statement for Cementitious and Reactive Waterproofing Works

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities for Cementitious and Reactive Waterproofing for Floor and Walls of Evaporator pits, Electrical Cable Trenches, Sump Pits and other locations as shown on

Method Statement for Cementitious and Reactive Waterproofing Works Read More »

Method Statement for Civil Works

Demolition Method Statement for Building Structures or Services

Demolition requires very careful and safe method in order to make sure that persons involved and other related parties are protected from any hazards. Demolition may affect the public, workers and adjacent structures. Therefore a well defined procedure is necessary that will be strictly followed during the demolition work. The following method Statement describes the

Demolition Method Statement for Building Structures or Services Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
error: Content is protected !!
Scroll to Top