Web Master

Roof Trusses Fabrication swms

Roof Trusses Fabrication Safe Work Method Statement SWMS

The sub-contractor or person doing the work is responsible for carrying out a particular action, as listed in this safe work method statement SWMS. The supervisor is responsible to ensure that the sub-contractor or person doing the work is competent and satisfied with the procedures listed. The supervisor is required to provide supervision, to the […]

Roof Trusses Fabrication Safe Work Method Statement SWMS Read More »

Construction Method Statements, Method Statement for Civil Works, Method Statements, Occupational Health and Safety, Stainless Steel Fabrication
Construction Project Management and Methodology

Method Statement for an EPC Construction Project

This method statement for construction project consists of the following sections. 1. General Execution Strategy 2. Details of Design and Engineering Plan 3. Material Management Planning and List of Long Delivery Material 4. Construction and Installation Activity 5. Safety and Environmental Plan 6. Quality Assurance Planning Section 1. General Execution Strategy Contractor will be responsible

Method Statement for an EPC Construction Project Read More »

Civil Engineering Methods, Method Statements, Project Planning, Quality Management, Technical Articles
Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement

Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement

This method statement procedure covers the Testing and Commissioning of sprinkler and firefighting standpipe systems installed at project, this will also ensure proper workmanship and that the work conforms to contract documents and applicable NFPA regulations. Commissioning manager will have the all the responsibility for the execution  of the Testing and Commissioning  activities, quality  and

Firefighting Sprinkler and Standpipe System Testing and Commissioning Method Statement Read More »

Fire Suppression System, Method Statements, Piping Method Statements, Testing & Commissioning
Ventilation Fans Installation Method Statement

Ventilation Fan Installation Method Statement

This document applies to the inward site inspection, installation and inspection methods to be adopted for the ventilation fan installation. After receiving on the project site, ventilation fans shall be stored in a clean / dry place and adequate covering by tarpaulin sheets to be provided to protect the equipment from deposition of construction dust

Ventilation Fan Installation Method Statement Read More »

HVAC Method Statements, Method Statements
Pipe Jacking Method Statement Using Automatic Tunneling Machine

Pipe Jacking Method Statement Using Automatic Tunneling Machine

The objective of this method statement is to define the installation sequence of casing pipe by means of Pipe Jacking using Herrenknecht Automatic Tunneling Machine with Slurry Material Removal (AVN machines). Table of Content Soil investigation. Identification and location of existing utilities. Responsibilities Labor, equipment’s and material required to complete the work. Handling and disposal

Pipe Jacking Method Statement Using Automatic Tunneling Machine Read More »

Civil Engineering Methods
End Connection dimensions for y strainer

YStrainer Installation and Maintenance Guidelines

This page is providing you some important guidelines for installing and maintaining the Y-Strainers. These tips shall help you in achieving the quality work and right first time. If you want to read a full method statement for strainer installation you can search our website. First we shall see some useful installation tips and this

YStrainer Installation and Maintenance Guidelines Read More »

Method Statements, Preventive Maintenance, Technical Articles
error: Content is protected !!
Scroll to Top