Computer Based Central BMS Submittals & Controller Requirements

ACCEPTABLE BID PROCEDURES FOR BMS SYSTEM It is the intent of this specification to define a state-of-the-art distributed computerized software Integrated Building Management and Control System which is user friendly, has known reliability, is extremely responsive, and which is to be designed, installed, implemented, and supported by a local office of the manufacturer by people […]

Computer Based Central BMS Submittals & Controller Requirements Read More »

Building Management System
SOA of AHU

Sequence of Operation for Single Zone Variable Volume Type Recirculating Air Handling Units AHU

Below sequence of operation is for single zone Variable Volume type recirculating Air Handling Units AHU’s. The system shall be variable volume package Fresh Air Handling Unit. The covering of the sequence shall consist of: Supply Side coverage of scope Intake motorized damper Panel (Pleated) Filter Bag Filter Cooling Coil Supply Fan (with VFD) Intake and discharge

Sequence of Operation for Single Zone Variable Volume Type Recirculating Air Handling Units AHU Read More »

Building Management System, Testing & Commissioning

Drainage Pipe Installation & Hydrostatic Testing Method of Statement

When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required for sizes below 160mm. Drainage pipes shall not be stored under direct sunlight

Drainage Pipe Installation & Hydrostatic Testing Method of Statement Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements
PVC Pipe & Conduit Installation

Method Statement for PVC Electrical Conduit – PVC Pipe Installation

Plastic electrical pvc conduits are common item which is useful for electrical wiring using pvc pipe. Since these electrical conduits are not much stronger as compared to metallic GI conduits therefore need proper handling and storage. Plastic electrical conduit pipes while unloading shall be lowered properly, not dropped to the ground. While during the storage,

Method Statement for PVC Electrical Conduit – PVC Pipe Installation Read More »

Electrical Method Statements, Method Statements
Fire alarm system testing and commissioning

Method Statement for Testing and Commissioning of Fire Alarm System

Before starting the commissioning of Fire Alarm System, make sure that system installation is complete and approval is available. Verify the absence of unwanted voltage between circuit conductors and ground. Test all conductors for short circuits using an insulating testing device. With each circuit pair, short circuit at the far end of the circuit and

Method Statement for Testing and Commissioning of Fire Alarm System Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

Method Statement for Installation of GI Ducts for HVAC System

This mechanical hvac method statement covers the installation of GI ductwork. Procedure defines the method used to ensure GI ducting installation has been carried out as per contract requirements and best practices. The method statement gives details of how the work will be carried out and what health and safety issues and controls are involved.

Method Statement for Installation of GI Ducts for HVAC System Read More »

HVAC Method Statements, Method Statements
Project Manager Responsibilities

PMC Project Manager Roles & Responsibilities

TYPICAL PROJECT RESPONSIBILITIES FOR A PROJECT MANAGEMENT COMPANY: THE PROJECT MANAGER The Project Manager shall perform the Services strictly in accordance with the skill, care and diligence reasonably to the expected of a professional international project management consultant experienced in the provision of like services with due regard to protecting and representing the Client’s interests.

PMC Project Manager Roles & Responsibilities Read More »

Quality Management, Technical Articles
Reinforcement-Bars-requirement-sizes-and-weight

Concrete Reinforcement Standard Requirements and Specifications

All reinforcement for use in the permanent works shall be specified on the drawings and shall comply with the Standards specified below. Deformed bars shall have Type 2 bond classification. BS or American Standards are applicable as mentioned but not limited to the following. BS 4449: Carbon Steel Bars for Reinforcement of Concrete BS 8666-2000, BS EN

Concrete Reinforcement Standard Requirements and Specifications Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements