Web Master

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset

General Requirements Batteries, fuel & auxiliary power must be isolated before carrying out initial inspection. Ensure that the control switch is in the OFF position and emergency switch is pressed. Ensure that the panel has the correct fascia and labels. Note: All test sheets containing test values shall be forwarded to concern parties for records All

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
civil-engineering-transportation-engineering

Civil Engineering | Construction Structural Architectural Engineering

Before reading more about civil engineering let’s first talk a little about what is Engineering? The word engineer originates from the Latin term ingenerare that means to invent, to create or to regulate. So in summary we can define engineering the professional art of applying scientific principles to every day things to help make life

Civil Engineering | Construction Structural Architectural Engineering Read More »

Civil Engineering Methods

Welding Procedure | Arc Welding Machine

This welding procedure or Method statement describes in detail the welding process for pipe work and the welder’s qualification test procedures. This includes addressing programs for implementing commitments regarding the quality of welding works. Scope and Purpose This document outlines the method for executing welding procedure for pipe work and welding procedure qualification test for ARC Welder. This

Welding Procedure | Arc Welding Machine Read More »

Method Statements, Piping Works

Critical Site Electrical Testing Requirements for Electrical Contractors

Below we have given few guidelines for electrical testing which can help electrical engineers & electrician to understand what are general requirements for doing the testing & commissioning of electrical systems at any kind of project or facility. All electrical plants & equipment’s are inspected and tested during and after installation as applicable on site

Critical Site Electrical Testing Requirements for Electrical Contractors Read More »

Testing & Commissioning
structured cabling system testing requirements

Structured Telephone & Data Cabling System Testing Requirements

All cables and termination hardware shall be 100% tested for defects in installation and to verify structured cabling system performance under installed conditions according to the requirements of ANSI/TIA 1152, ANSI/TIA-568 C.2 and IS&T. All pairs of each installed cable shall be verified prior to system acceptance. Any defect in the cabling system installation including

Structured Telephone & Data Cabling System Testing Requirements Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

MEP Project Execution Strategy & Methodology

Detailed programming of all MEP work activities will be prepared in full coordination with the main contractors programme. Builder’s works drawings will be prepared to show all openings sleeves and cast in items, Wherever necessary back up calculations will be prepared and submitted to Consultant. For specialist equipment a suitably qualified specialist subcontractor will be used. Working

MEP Project Execution Strategy & Methodology Read More »

Civil Engineering Methods, Quality Management, Technical Articles
error: Content is protected !!