2018
Jul
16

Method Statement for Ground Preparation of Excavations & Service Trenches

excavation-requirements

This document covers excavation and ground preparation for the roadway and service trenches and shall include all excavation, shaping and sloping necessary for the construction, preparation and completion of all subgrade, shoulders, slopes, gutters, intersections, approaches, entrances and trenches in conformity to

2018
Jun
22

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams

Prior transferring materials from lay down, the foreman shall make a materials inventory at the lay down area as per approved shop drawings if the all materials required for the passenger’s elevator hooks, hook beams and divider beams are all available at

2018
Jun
21

Procedure for Installation of Steel Structure for Pump Rooms

Installation-of-Steel-Structure-method-statement

The following Method Statement describes the procedure and equipment required for the installation of steel structure for pump room. Following equipment shall be arranged: Lifting Equipment: Tower Crane (if available) To lift the beams/Purlins structure from ground floor to the roof where  the

2018
May
3

Best Construction Method Statement Example

Piling Cage Installation

If you are looking for a professional construction method statement example then this page is helpful for you. We help you to understand the structure and requirements of a typical construction method statement. The information given is useful for engineers and other

2018
Apr
14

Quality Assurance Surveillance Plan Basic Implementation Steps

quality assurance surveillance plan

Quality assurance surveillance plan is an important plan that is meant to ensure conformance to the performance statement of work. This plan is beneficial for the clients and government agencies. Because QASP conforms whether the deliverables from contractors are according to the