Web Master

Variable Air Volume VAV Installation Testing and Commissioning Method Statement

Variable Air Volume Installation Testing and Commissioning Method Statement

This method Statement shall cover the Supply, Installation, testing and commissioning of VAV Variable Air Volume System in line with project requirements as indicated in the approved HVAC shop drawings, specifications and VAV manufacturer’s instructions. Arrange following tools before starting the VAV installation and testing activities: Mechanical Tool Box Electric Drill Machine Step Ladders Threading […]

Variable Air Volume Installation Testing and Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
cable management diagrams

Cable Management Standard Procedure for Server Rooms

Cable management is a key component of Data Center and Network Management. It refers to an important step during the installation of building services (i.e. electrical services especially ELV systems) and the subsequent installation of equipment providing means to efficiently secure electrical, data, and other cables. For data cables, once an errant port has been

Cable Management Standard Procedure for Server Rooms Read More »

Electrical Method Statements, Method Statements
Clean Agent Fire Suppression System Best Installation Method Statement

FM 200 Novec Ansul Clean Agent Fire Suppression System Installation Method of Statement

This procedure covers installation and inspection of clean agent fire suppression system, the procedure is for FM 200 but can be useful for many other systems like Novec, Ansul etc. Quality of clean agent fire suppression system installation and materials at site will be ensured by project team consisting of a Project Manager, Project Engineers,

FM 200 Novec Ansul Clean Agent Fire Suppression System Installation Method of Statement Read More »

Fire Suppression System, Method Statements, Testing & Commissioning
pressure vessel calculations

Pressure Vessel Calculations

Pressure Vessel is briefly is a storage device, which could store fluids above 15PSI. These are generally designed based on ASME codes, if vessel does not have heating mechanism(unlike boilers), it can be designed by ASME Section VIII. For PVs with pressure 15PSI to 3000PSI, division 1 is used, for pressures between 3000PSI to 10000PSI,

Pressure Vessel Calculations Read More »

Technical Articles
Cathodic Protection System for Storage Tanks Installation Method Statement

Storage Tank Fabrication Erection and Testing Method Statement

This procedure covers detailed activities for fabrication, erection and testing of the storage tanks, and also equipment & manpower required for the same. Storage tank fabrication tasks / activities need to be carried out with utmost care with good workmanship and in accordance with the project specifications to achieve satisfactory completion of the whole process.

Storage Tank Fabrication Erection and Testing Method Statement Read More »

Construction Method Statements, Method Statements, Occupational Health and Safety, Stainless Steel Fabrication, Technical Articles
Lifting Work Safety Method Statement

Lifting Work Safety Method Statement

This document covers the procedure to establish a method statement for all lifting activities for any kind of project especially laying of large transmission pipelines. The purpose of this document is to follow proper methodology and to carry out the activities and sequence of lifting works for laying of transmission pipelines at any kind of

Lifting Work Safety Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Occupational Health and Safety, Project Planning, Risk Assessment
GCB Generator Circuit Breaker Installation Method Statement

GCB Generator Circuit Breaker Installation Method Statement

Purpose of this method statement is to define the sequence of GCB generator circuit breaker installation and safe execution of the job. Procedure applies for GCB transportation, handling, and installation at electrical building / roof where these activities will be performed as per the project requirements. Arrange below mentioned equipment before installation of generator circuit

GCB Generator Circuit Breaker Installation Method Statement Read More »

Construction Method Statements, Electrical Method Statements, Method Statements
Demolition-Method-Statement

Method Statement for Demolition Works

Below is precise method statement for demolition works that has been prepared to demonstrate the safe working method for the soft strip of internal fixtures/fixings and identified items, asbestos removal and demolition of the existing structure. This safework method is to be read in conjunction with provided drawings and Hazard surveys. This method statement is

Method Statement for Demolition Works Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements, Occupational Health and Safety