Method Statement for Cementitious and Reactive Waterproofing Works

method statement for Cementitious Water proofing

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities for Cementitious and Reactive Waterproofing for Floor and Walls of

2018
Aug
16

Demolition Method Statement for Building Structures or Services

Demolition requires very careful and safe method in order to make sure that persons involved and other related parties are protected from any hazards. Demolition may affect the public, workers and adjacent structures. Therefore a well defined procedure is necessary that will

2018
Aug
11

Method Statement For Installation Of Porcelain Tiles for Floors and Walls

tiling work at walls

Below is the detailed method statement For installation of tiles on floors and walls. Semi-Dry Mortar method is useful for floor tiles works and for wall thin-bed adhesive method is useful. The aim of this method statement is to provide and maintain

2018
Aug
8

Method Statement for Bituminous Protective Coating Water Proofing

Water Proofing

It is essential to water proof a structure to prevent the seepage or penetration of water for its durability. Water proofing is required for many areas like basements, sunken portions, roofs, terrace gardens and expansion joints etc. Usually extensive waterproofing measures are added

2018
Aug
7

Method Statement for Assembling Erection Installation & Management of Mast Climber

Mast Climber Installation Method statement

The Scope of this method statement covers all operations and associated activities involved in safe and efficient management of Mast Climber including assembling, erection, and installation for efficient and effective utilization in execution of project works. Following equipment shall be arranged: Tower

2018
Aug
6

Method Statement for Installation of Roof Shading Louvers With Aluminium Cladding

installation method statement for Roof Shading Louvers

Before starting the construction work, ensure that all necessary work permit and safety requirements are complete. Supervisor to check that safety personnel is available to monitor the construction activity before start of work. HSE site engineer/office will ensure monitoring of the applicable