Web Master

Bored Pile (Cast-in-Situ) Construction Method Statement

Bored Pile (Cast-in-Situ) Construction Method Statement

The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated risks involved, develop and implement adequate control measures and to provide a safe […]

Bored Pile (Cast-in-Situ) Construction Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Precast Post Tensioned Beam Installation Procedure

This civil method statement is prepared to state the proposed construction method for prestressing works and shall be, upon approval by the consulting engineer, distributed to all parties concerned so that the prestressing works can be carried out with the same information. The prestressing systems is STRONG FORCE (M) Multi Strand Bonded System using 15.24mm

Precast Post Tensioned Beam Installation Procedure Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements

Painting Standard Specifications for Enamel & Emulsion Painting Techniques

All paints to be used shall be those supplied by approved manufacturers. The quality of paints shall comply with MS 125 in respect of oil/ enamel paints and MS 134 in respect of emulsion paints/acrylic paint. Prior to commencement of the painting work, the Contractor shall submit the following to the client/consultant: i) Name of

Painting Standard Specifications for Enamel & Emulsion Painting Techniques Read More »

Civil Engineering Methods
Cathodic Protection System for Storage Tanks Installation Method Statement

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure

Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the best quality workmanship for the scope of work. All project site, QA/QC and

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure Read More »

Construction Method Statements, Method Statement for Civil Works, Method Statements, Plumbing Method Statements, Stainless Steel Fabrication
jointing procedure using solvent cement

Installation Method Statement for Water Feature Piping Equipment and Accessories

Below is a brief method statement that covers installation of water feature equipment’s and accessories, in accordance with project specifications and manufacturer’s installations. MEP project manager, engineers site supervisors shall have overall responsibility for adherence to the approved method statement, project quality and site safety plan. They shall ensure that adequate resources and personnel are

Installation Method Statement for Water Feature Piping Equipment and Accessories Read More »

Method Statements, Piping Works, Plumbing Method Statements
Method Statement for Structured Cabling System Installation

Method Statement for Structured Cabling System Installation

This method of statement covers the nature and type of work for structured cabling installation as per approved material submittal and site requirements for the construction project. Method statement also covers frequency of which the inspections are to be carried out. Any contractor to carry out works under main contractor must comply with this method

Method Statement for Structured Cabling System Installation Read More »

Electrical Method Statements, Method Statements

Sprinkler System Installation Procedure

Pre-construction meeting will take place to brief all requirements on the implementation of this firefighting method statement. All operatives will attend the Project Safety induction prior to commencing work on site. As a minimum requirement, daily toolbox talk will explain and discuss: The day’s work is for the team and individuals planned sequence of work

Sprinkler System Installation Procedure Read More »

Fire Suppression System, Method Statements, Piping Method Statements, Piping Works, Plumbing Method Statements

Construction Project Quality Plan Basic Requirements & Template

Below are basic sections that can form a good project quality plan for construction sites. 1. Introduction Construction Quality Control Plan (CQCP) for any kind of project is implemented to ensure that construction procedures are performed in compliance with the plans and specifications under the contract requirements. The CQCP provides means to maintain effective quality

Construction Project Quality Plan Basic Requirements & Template Read More »

Project Planning, Quality Management, Templates
error: Content is protected !!