Web Master

Piping Installation, Welding & Fabrication Method Statement

TABLE OF CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESOURCES RESPONSIBILITIES SEQUNCE OF WORKS QA/QC REQUIREMENTS HSE REQUIMENTS EMERANCY CONTACTS Purpose: The purpose of this methodology is to provide a systematic control and direction for the activity for the installation of piping at a construction site. This method statement provides the expectation to execute work in safe, […]

Piping Installation, Welding & Fabrication Method Statement Read More »

Method Statements, Piping Method Statements, Piping Works, Stainless Steel Fabrication
standby diesel generator installation instruction

Generator Installation Method Statement Including Fuel Tank Installation at High Level

This method statement covers the generator and fuel tank installation for any kind of project. Prior to commencement of the works, all activities shall be coordinated with Project Safety Officer and PTW holder, who will assess the associated risks, and monitor the implementation of the work as per the Project Safety Plan and liaise with

Generator Installation Method Statement Including Fuel Tank Installation at High Level Read More »

Electrical Method Statements, Method Statements
Mass (Ribbon) Fusion Splicing

Termination of Fiber Optic Cables

This fiber optic installation method statement covers the termination of fiber optic cables with patch panel, network distribution cabinet NDC and door junction box but can be applicable for any kind of network installations. Roles and Responsibilities: The electrical manager shall be responsible for the overall implementation of this method statement, and to ensure that

Termination of Fiber Optic Cables Read More »

Building Management System, Electrical Method Statements
Method Statement for Dry Lean Concrete - Roadworks

Method Statement for Dry Lean Concrete – Roadworks

Below road works method statement covers the construction of Dry Lean Cement concrete sub-base for cement concrete pavement in accordance with requirement of roadwork specifications in conformity with the lines, grades and cross sections shown on the drawings and or as directed by the consulting engineer. The road construction shall be done in compliance with

Method Statement for Dry Lean Concrete – Roadworks Read More »

Civil Engineering Methods, Roadworks
Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

This macadam work method statement covers laying and compacting clean, crushed, graded aggregate and granular materials premixed with water into a dense mass on a prepared Granular Sub base Course to specified lines, grades and cross sections as shown in drawings, subject to a minimum thickness of 75 mm and max. of 200 mm. References

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base Read More »

Civil Engineering Methods, Method Statements, Roadworks
Method Statement for Concrete Sampling and Testing

Method Statement for Concrete Sampling and Testing

This method statement is applicable for collecting samples for concrete before and during concrete pouring activities and doing the standard tests. The aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities

Method Statement for Concrete Sampling and Testing Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements, Quality Management
Safe Work Procedure Working near Water or Over Water

Safe Work Procedure Working near Water or Over Water

The purpose of this document is to identify the environment, the activities and the associated risks for working over or near water and define the safety, health and environmental requirements with the aim to eliminate risks, or reduce it to as low as is reasonably practicable. This general procedure applies to all projects which are

Safe Work Procedure Working near Water or Over Water Read More »

Civil Engineering Methods, Method Statements, Occupational Health and Safety, Risk Assessment

Legionella Management & Prevention Plan (LMPP) For LEED & ESTIDAMA Green Building Projects

This document presents the Legionella Management & Prevention Plan (LMPP) for any type of public construction project. Project specific Legionella Prevention Plan (LPP) is prepared as per the LEED/ Estidama Requirement for Livable Buildings: Indoor Environmental Quality Requirement, Legionella Prevention. Normally the requirements are given within the project specifications, and contractor is responsible to develop

Legionella Management & Prevention Plan (LMPP) For LEED & ESTIDAMA Green Building Projects Read More »

Building Management System, HVAC Method Statements, Occupational Health and Safety, Templates