Web Master

Clean Agent Fire Suppression System Best Installation Method Statement

FM 200 Novec Ansul Clean Agent Fire Suppression System Installation Method of Statement

This procedure covers installation and inspection of clean agent fire suppression system, the procedure is for FM 200 but can be useful for many other systems like Novec, Ansul etc. Quality of clean agent fire suppression system installation and materials at site will be ensured by project team consisting of a Project Manager, Project Engineers, […]

FM 200 Novec Ansul Clean Agent Fire Suppression System Installation Method of Statement Read More »

Fire Suppression System, Method Statements, Testing & Commissioning
Cathodic Protection System for Storage Tanks Installation Method Statement

Storage Tank Fabrication Erection and Testing Method Statement

This procedure covers detailed activities for fabrication, erection and testing of the storage tanks, and also equipment & manpower required for the same. Storage tank fabrication tasks / activities need to be carried out with utmost care with good workmanship and in accordance with the project specifications to achieve satisfactory completion of the whole process.

Storage Tank Fabrication Erection and Testing Method Statement Read More »

Construction Method Statements, Method Statements, Occupational Health and Safety, Stainless Steel Fabrication, Technical Articles
Lifting Work Safety Method Statement

Lifting Work Safety Method Statement

This document covers the procedure to establish a method statement for all lifting activities for any kind of project especially laying of large transmission pipelines. The purpose of this document is to follow proper methodology and to carry out the activities and sequence of lifting works for laying of transmission pipelines at any kind of

Lifting Work Safety Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Occupational Health and Safety, Project Planning, Risk Assessment
GCB Generator Circuit Breaker Installation Method Statement

GCB Generator Circuit Breaker Installation Method Statement

Purpose of this method statement is to define the sequence of GCB generator circuit breaker installation and safe execution of the job. Procedure applies for GCB transportation, handling, and installation at electrical building / roof where these activities will be performed as per the project requirements. Arrange below mentioned equipment before installation of generator circuit

GCB Generator Circuit Breaker Installation Method Statement Read More »

Construction Method Statements, Electrical Method Statements, Method Statements
Demolition-Method-Statement

Method Statement for Demolition Works

Below is precise method statement for demolition works that has been prepared to demonstrate the safe working method for the soft strip of internal fixtures/fixings and identified items, asbestos removal and demolition of the existing structure. This safework method is to be read in conjunction with provided drawings and Hazard surveys. This method statement is

Method Statement for Demolition Works Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements, Occupational Health and Safety
Fan Coil Unit (FCU) Installation Method Statement

Method Of Statement For Installation Of Fan Coil Units And Packaged Air Conditioning Units

Below is mechanical method statement that is prepared in order to make sure that site installation of all types of Fan Coil Units and Packaged Air Conditioning Units and associated refrigerant pipework is done as per applicable requirements and manufacturer instructions. Procedure defines the method that will be used to ensure that the FCU &

Method Of Statement For Installation Of Fan Coil Units And Packaged Air Conditioning Units Read More »

Duct Works, HVAC Method Statements, Piping Works

Method Statement for Insulation & Cladding Of CHW Chilled Water Pipe

A precise chilled water pipe insulation procedure is given below: Check all required approved chilled water pipe insulation materials are readily available on site. Install the pipe insulation according to this method statement, taking into consideration the manufacturer instructions as per material submittal. Ensure all insulation materials are in dry condition at all times, especially

Method Statement for Insulation & Cladding Of CHW Chilled Water Pipe Read More »

HVAC Method Statements, Method Statements, Piping Works

TESTING OF CHILLED WATER PIPES & FITTINGS – HOW TO GUIDE

TESTING OF CHILLED WATER PIPES & FITTINGS Care will be taken to avoid all the equipment, apparatus, devices to a pressure exceeding its prescribed test pressure as obtained from its name plate data or product catalogs. All equipment, apparatus and devices that might be damaged by the test pressure shall be isolated, removed, bypassed or

TESTING OF CHILLED WATER PIPES & FITTINGS – HOW TO GUIDE Read More »

HVAC Method Statements, Method Statements, Pressure Testing, Testing & Commissioning
error: Content is protected !!
Scroll to Top