What Is A Building Management System – BMS System

What is a BMS system or Building Management System, in fact BMS is a microprocessor & computer based control system which is now installed in most of the buildings in order to control and monitor the installed equipment including all mechanical and electrical equipment and systems like HVAC, lighting, power, water supply and filtration system […]

What Is A Building Management System – BMS System Read More »

Building Management System, Technical Articles
Fire Protection Pipes and Fittings Installation Method Statement

Fire Protection Pipes and Fittings Installation Method Statement

This method statement covers the detailed procedure for installation of Fire Protection Pipes and Fittings. Procedure also defines the method used to ensure that the pipe work and fittings installation has been carried out as per the contract specification requirements. This method will be applicable for the installation of Fire Pumps, Valves, Zone control valves

Fire Protection Pipes and Fittings Installation Method Statement Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Piping Works, Plumbing Method Statements, Pressure Testing, Testing & Commissioning
Disinfection and Flushing of Water Mains

Disinfection and Flushing of Water Mains

Purpose of this plumbing method statement is to ensure that disinfection and flushing of water mains and related pipe lines are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented for the

Disinfection and Flushing of Water Mains Read More »

Method Statements, Piping Method Statements, Piping Works, Plumbing Method Statements, Testing & Commissioning
HVAC Method Statement for Grill Diffuser and Louver Installation

HVAC Method Statement for Grill Diffuser and Louver Installation

This hvac method statement covers the supply & installation of grilles, diffusers louvers & disc valves in line with project requirements as indicated in the approved shop drawings, reflected ceiling plans, specifications and manufacturer’s instructions. Plant and equipment required General tool box including screwdrivers Electric drill with appropriate bits Spirit level, water level Measurement tape

HVAC Method Statement for Grill Diffuser and Louver Installation Read More »

Duct Works, HVAC Method Statements
Earthworks Method Statement

Earthworks Method Statement

This method statement for earthworks defines requirements for civil work related activities, but it doesn’t cover the earthwork activities related to underground piping, conduits and ducts which are covered under different earthworks method statements. All the earthworks shall be done in accordance with applicable standards, specifications, regulations and Client’s reference documents for the project. Terms

Earthworks Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Micro Pile Installation and Pile Test Method of Statement

Micro Pile Installation and Pile Test Method of Statement

Scope of this work method statement shall apply on the reinforced concrete works and the objective is to define and establish the work method of statement for the reinforced concrete work for the installation of micro pile. The piling installation work shall be done in compliance with construction drawings and contract specifications. Following personnel are

Micro Pile Installation and Pile Test Method of Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Water Booster Pump Installation Testing and Commissioning Method Statement

Water Booster Pump Installation Testing and Commissioning Method Statement

Below is a precise method of statement for water pump or booster pump installation including the testing and commissioning steps. Make sure that proper clearance is available from civil side before commencement of water pump installation works. Ensure that the work area is clean and safe for carrying out the activities. Also prior to start

Water Booster Pump Installation Testing and Commissioning Method Statement Read More »

Method Statements, Plumbing Method Statements, Testing & Commissioning
Heat Exchanger Installation Testing and Commissioning Method Statement

Heat Exchanger Installation Testing and Commissioning Method Statement

Unless otherwise specified, all plate heat exchanger installation shall be in accordance to approved shop drawings, manufacturer instructions and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Heat Exchanger’s. Install Plate Heat  Exchanger’s as indicated unless deviations to layout are approved on coordination drawings. Plate Heat Exchanger shall be installed

Heat Exchanger Installation Testing and Commissioning Method Statement Read More »

HVAC Method Statements, Preventive Maintenance, Testing & Commissioning