Scope of this work method statement shall apply on the reinforced concrete works and the objective is to define and establish the work method of statement for the reinforced concrete work for the installation of micro pile. The piling installation work shall
Read Complete Method
Kidde Argonite® Fire Protection Systems are clean agent, automatic fire extinguishing systems that use Argonite (IG-55) and consist of four basic components and their associated accessories: • Argonite Cylinders and Components, • Completer Kits, • Control Panels, • Detection and Alarm Devices.
Read Complete Method
Below is a precise method of statement for water pump or booster pump installation including the testing and commissioning steps. Make sure that proper clearance is available from civil side before commencement of water pump installation works. Ensure that the work area
Read Complete Method
Unless otherwise specified, all plate heat exchanger installation shall be in accordance to approved shop drawings, manufacturer instructions and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Heat Exchanger’s. Install Plate Heat Exchanger’s as indicated unless deviations
Read Complete Method
Below is a precise method statement for scaffolding installation for any kind of project. The following method statement is written to provide a safe and efficient system of work for the installation of general working scaffold to all areas of construction sites
Read Complete Method
This roadwork method statement describes work methodology for road construction covering the activities from subgrade to asphalt work. All personnel working at site shall have full knowledge and expertise in the excavation, backfilling, compaction and road testing process. Occupational health and safety
Read Complete Method
The purpose of this method statement is to define the steps to implement the correct practices for the installation of chemical dosing system (pot) for chilled water piping. By following this procedure contractor shall ensure that the performance of the chemical dozing
Read Complete Method
This method statement covers all processes related to Testing & Commissioning of Laboratory Gas System, procedure is to be read in conjunction with the relevant ITP, outlining the responsibility and the quality verification to be performed by various parties. Project manager is
Read Complete Method