  • Sequence of Operation for Variable Volume Type Fresh Air Handling Units

    Sequence of Operation for Variable Volume Type Fresh Air Handling Units

    Sequence of operation is very important part of testing and commissioning of equipment’s. This becomes more important when matter of mechanical systems is considered. SOO is technical document that is developed based upon the mechanical systems performance and operation requirements. Sequence of operation is part of building management system BMS submission documents. BMS covers the…

  • Gypsum Board Ceiling Installation Method Statement

    Gypsum Board Ceiling Installation Method Statement

    Below is best method statement for gypsum board ceiling that can be useful for any kind of project submission and site works. The purpose of this ceiling method statement is to ensure that the gypsum board suspended ceiling and related activities are executed safely, in accordance with the contract requirements and that all quality assurance…

  • Tensile Fabric Shades Fabrication and Installation Methodology

    Tensile Fabric Shades Fabrication and Installation Methodology

    Below is a precise method statement that covers the fabrication and installation of fabric components of the tensile fabric shades that includes: Shades over outdoor playgrounds Shades over swimming pool Car park shades Fabric roof over cafeteria This procedure shall be read in conjunction with project specifications wherever applicable. Below is the equipment required for…

  • Concrete Casting, Placement, Curing and Defect Rectification Method

    Concrete Casting, Placement, Curing and Defect Rectification Method

    Below is a brief method statement that describes the practices and methods with regards to concrete placing, curing and defect rectification. Below is list of reference documents useful for this method statement. Contract specification cast in place in concrete Hazard Analysis table Inspection and Test Plan BS 8110 Concrete Placement: Complete all quality control checks…

  • Structured Cabling System SCS Testing and Commissioning Requirements

    Structured Cabling System SCS Testing and Commissioning Requirements

    Below are brief guidelines that can be followed or considered for testing & commissioning of structured cabling system including voice, telephone and data systems. Characterizing the cabling system provides useful data for the support of future equipment application. The verification of the transmission performance of cable through field measurements results in a more professional hand…

  • Installation of Electrical Systems for HVAC Wild Air Cooling of Projects

    Installation of Electrical Systems for HVAC Wild Air Cooling of Projects

    This method statement details the method related to sequence of installation of electrical works in order to achieve the wild air cooling for under construction building of large projects. The installation of electrical works such as panel installation comprises the following activities. Site Clearance. Installation of necessary containment system. Area clearance for Electrical Room, Plant…

  • Laboratory Air Flow Control System & Fumes Hood Monitoring Testing and Commissioning

    Laboratory Air Flow Control System & Fumes Hood Monitoring Testing and Commissioning

    Below is the method statement description for performing the testing and commissioning of laboratory air monitoring and fumes hood system for any type of chemical and research laboratory. Scope of this method statement is testing and commissioning of laboratory air flow control system including the fumes hood monitoring system. Testing and commissioning shall ensure the…

  • Emergency Lighting Monitoring System Testing and Commissioning

    Emergency Lighting Monitoring System Testing and Commissioning

    This method statement is for commissioning of Easi-Check Emergency Lighting Monitoring Systems comprising of both single and multiple EC2001 Easi-Check panels Stand Alone or Networked together complete with front end P.C. having Site Monitor/ graphics software installed. General Requirements Before works commence the engineer should have obtained certified copies of as ‘fitted drawings’ of the installation from the…