Download Method Statement For Internal Painting Works

Download Method Statement For Internal Painting Works

 Download Package Contains the Method Statement +

Checklists for Painting +

Inspection & Testing Plan +

Risk Assessment 

You only need to change project name and

insert logos etc and the same shall be

ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

Method Statement for Internal Painting Works

The files are in Word/Excel formats and instantly available

after you pay the cost of only 2.99$.

 Download Method Statement with Checklists & ITP

Click Below “Buy” link and Download Instantly.





error: Content is protected !!
Scroll to Top