The purpose of this Method Statement is to define the procedures, responsibilities, safety requirements, quality control measures, and acceptance criteria for the installation, testing, commissioning, and final acceptance of the automatic sprinkler system.
The objective is to ensure that the sprinkler system is installed and commissioned in accordance with approved shop drawings, hydraulic calculations, project specifications, manufacturer recommendations, and internationally recognized fire protection standards. The completed system shall provide reliable automatic fire suppression performance and be fully operational before project handover.
Download package contains the Method Statement +
Checklist for Installation +
Checklist for Testing & Commissioning +
Hydro Static Test Certificate +
Inspection & Testing Plan +
Quality Control Procedure QCP +
Risk Assessment
You only need to change project name and
insert logos etc and the same shall be
ready to be submitted for approval from consultant/clients.