Category Archives: Testing & Commissioning

Testing, Commissioning, Training, Handover and DLP Strategy for a Project

Testing & Commissioning Testing & commissioning is done once all civil & MEP system installation is completed, inspected and approved. Before starting the T&C activities a comprehensive testing & commissioning plan is prepared and approval is taken from client/consultant. It is discussed and mutually agreed whether the T&C can be done on temporary power or… Read More »

Testing & Commissioning Procedure for Ventilation and General Exhaust Fans

Mechanical Pre-commissioning checks for Exhaust Fans Carefully inspect the unit and check the installation with anti vibration materials is complete. Check and ensure the shipping bolts / clamps are removed. Check tightness of all nuts / bolts, screws, fasteners etc. as applicable. Check the alignment of belts and adjust the tension (where applicable). Check the ductwork connections… Read More »

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans  Download Package Contains the Method Statement + Inspection & Testing Plan + Checklists for Pre Commissioning  + Checklists For Testing & Commissioning You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.… Read More »

Download Method Statement For Testing & Commissioning Of Smoke Management System

Download Method Statement For Testing & Commissioning Of Smoke Management System  Download Package Contains the Method Statement + Checklist for Testing &  Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of… Read More »

Sequence Of Operation For Variable Volume Type Fresh Air Handling Units

Sequence of operation is very important part of testing and commissioning of equipment’s. This becomes more important when matter of mechanical systems is considered. SOA is technical document that is developed based upon the mechanical systems performance and operation requirements. Sequence of operation is part of building management system BMS submission documents. BMS covers the… Read More »

Download Method Statement For Installation & Testing Of Vacuum System

Download Method Statement For Installation & Testing Of Vacuum System  Download Package Contains the Method Statement + Checklist for Installation + Checklist for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below… Read More »