Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Method Statement for Drainage Pipe Installation – PVC uPVC Drainage Piping Under / Above Ground

This method statement is applicable for all drainage pipe works underground, above ground, horizontal and vertical drainage piping for any kind of the project as specified in project specification. It is responsibility of project manager and project plumbing engineer to ensure the availability of coordinated drawings and the required materials as per the project specifications. […]

Method Statement for Drainage Pipe Installation – PVC uPVC Drainage Piping Under / Above Ground Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements

Nitrogen Flushing of Air Conditioning and Refrigeration Systems

Below is the standard procedure for the proper flushing of air-conditioning and refrigeration system with the use of dry nitrogen, and refrigeration equipment which require flushing of the system after exposing it to the atmosphere or during replacement of the refrigerant compressor. Responsibilities:  It is the responsibility of the A/C technician to conduct flushing of the

Nitrogen Flushing of Air Conditioning and Refrigeration Systems Read More »

HVAC Method Statements, Method Statements
Concrete Formwork Method Statement

Concrete Formwork Method Statement

The purpose of this document is to lay down the systematic procedures for the various activities required for concrete formwork to ensure that all works are carried out in accordance with the approved shop drawings and contract specifications. This civil method statement is a general outline for fabrication and use of formwork for any kind

Concrete Formwork Method Statement Read More »

Civil Engineering Methods, Method Statement for Civil Works
Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of chilled water pressurization unit through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to the satisfactory level of

Chilled Water Pressurization Unit Testing & Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
cable connections and termination method statement

Method Statement For Cable Pulling and Final Electrical Connections To MV & LV Equipment

1. Purpose This Method statement covers the installation and final electrical connections to the MV and LV equipment at any electrical project site. All the electrical installation work will be in accordance with the project electrical specifications. 2. Scope of Work This procedure covers the method for all the cable pulling, electrical connections and terminations for

Method Statement For Cable Pulling and Final Electrical Connections To MV & LV Equipment Read More »

Electrical Method Statements
Copper Piping Method Of Statement For Installation

Copper Pipe Joint Method Statement | Flaring & Swaging

The purpose of this method statement is to establish a standard procedure for the proper cutting and jointing of copper pipe by using the right tools and procedure i.e. flaring or swaging joints. Below method will also serve as guideline for newly hired employee which will be dealing with air conditioning unit maintenance activity or

Copper Pipe Joint Method Statement | Flaring & Swaging Read More »

HVAC Method Statements, Method Statements, Piping Method Statements

Transformer Installation Method of Statement for any type of Project

Below electrical method statement explains and covers the transformer installation procedure for any kind and size of the project. By following this method of statement the electrical installation team shall ensure that installation of transformer is done as per the applicable specifications, codes and standards also ensuring the compliance with the manufacturer installation manuals/instructions. Necessary

Transformer Installation Method of Statement for any type of Project Read More »

Electrical Method Statements, Method Statements

Transformer Testing & Commissioning Method Statement

Below is a standard electrical method statement which can be used as reference to prepare further detailed method statement for testing and commissioning of transformers. Below is list of necessary tools for transformer testing & commissioning. Portable Hand Tools / Tool Box. Digital Multimeter Earth Resistance Tester Megger Tester. Safety requirements tools such as safety

Transformer Testing & Commissioning Method Statement Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
error: Content is protected !!
Scroll to Top