Electrical Method Statements

Electrical method statement is used for safe implementation and construction of electrical works.

Before performing any electrical engineering activity one must prepare a method statement for electrical work that will describe scope of work, references, responsibilities, required materials and resources.

The main section of an electrical method statement for construction shall contain steps for installation and construction of the electrical works and components.

We are providing editable method statement swms packages, you can check a sample of  free electrical method statement and after that decide about downloading the full package.

In addition to method statement you shall find inspection and testing plan, inspection/testing checklists and risk assessments for doing the work as part of method statement for electrical works.

Below you can find complete set of electrical method statements and also you can search from the top left section of this page.

In addition you can also find complete set of editable electrical method statement in the form of editable files which are in Word / Excel formats and you only need to insert logo of your company and it is ready for submission and approval.

Click here to download electrical method statements.

Method Statement For Switchgear Installation Of MV LV HV Switchgear Panels

Switchgear Installation Method Statement – MV LV HV Switchgear Panels

1.0 PURPOSE The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for medium voltage switchgear panel installation & its accessories through the guidelines contained herein so as to ensure that the job execution complies with specifications and serves the intended function to satisfactory level. […]

Switchgear Installation Method Statement – MV LV HV Switchgear Panels Read More »

Electrical Method Statements
Motor Control Centre MCC Panel Installation Method Statement

Motor Control Centre MCC Panel Installation Method Statement

Below is a precise electrical method of statement for the installation of MCC panels. All components / materials received at site shall be inspected to ensure compliance with the approved material submittals and project electrical specifications Any discrepancies / damages shall be notified immediately for further action. Any factory test reports shall be checked and

Motor Control Centre MCC Panel Installation Method Statement Read More »

Electrical Method Statements

MV Switchgear Installation Method Statement

This method statement for installation of medium and low voltage switchgear and panels boards on site is prepared to define the method used to ensure that all MV/LV switchgear and panels site assembly, installation, final connection and workmanship is correct and acceptable and conforms to the contract documents & electrical specifications. The Project Manager is

MV Switchgear Installation Method Statement Read More »

Electrical Method Statements
standby diesel generator installation instruction

Generator Installation Method Statement Including Fuel Tank Installation at High Level

This method statement covers the generator and fuel tank installation for any kind of project. Prior to commencement of the works, all activities shall be coordinated with Project Safety Officer and PTW holder, who will assess the associated risks, and monitor the implementation of the work as per the Project Safety Plan and liaise with

Generator Installation Method Statement Including Fuel Tank Installation at High Level Read More »

Electrical Method Statements
Mass (Ribbon) Fusion Splicing

Termination of Fiber Optic Cables

This fiber optic installation method statement covers the termination of fiber optic cables with patch panel, network distribution cabinet NDC and door junction box but can be applicable for any kind of network installations. Roles and Responsibilities: The electrical manager shall be responsible for the overall implementation of this method statement, and to ensure that

Termination of Fiber Optic Cables Read More »

Building Management System, Electrical Method Statements
Method of Statement for Installation of Power / Electrical Bus bar

Method of Statement for Installation of Power / Electrical Bus bar

Busbars installation shall be done in accordance with approved shop drawings and properly coordinated with Site Engineer’s for the exact locations and levels.  Before starting the installation of power electrical busbar following tools shall be arranged: PREPARATION FOR BUS BAR INSTALLATION The marking of the route on site to be carried out prior to commencement

Method of Statement for Installation of Power / Electrical Bus bar Read More »

Electrical Method Statements
Water Leak Detection System Testing & Commissioning Method of Statement

Water Leak Detection System Testing & Commissioning Method of Statement

This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case of any contradictory matters that may arise. Purpose of this method is to

Water Leak Detection System Testing & Commissioning Method of Statement Read More »

Electrical Method Statements, Testing & Commissioning
Scroll to Top