Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Concrete Casting, Placement, Curing and Defect Rectification Method

Below is a brief method statement that describes the practices and methods with regards to concrete placing, curing and defect rectification. Below is list of reference documents useful for this method statement. Contract specification cast in place in concrete Hazard Analysis table Inspection and Test Plan BS 8110 Concrete Placement: Complete all quality control checks […]

Concrete Casting, Placement, Curing and Defect Rectification Method Read More »

Civil Works Method Statements
Steel Bar Rebar Reinforcement Cutting and Bending Procedure

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the specific project contract documentation. In any circumstances where specifications are not provided or

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure Read More »

Civil Works Method Statements
Method Statement for Oil Storage Tanks Calibration

Method Statement for Oil Storage Tanks Calibration

Tank Calibration is the process of determining the volumetric content of a tank per unit height of liquid. This procedure shall be intended for calibration of Oil Storage Tanks. The calibration shall be carried out by Optical Reference Line Method (ORLM) in accordance with API Standards i.e.  API 2550, Section 2B and ISO 7507, Part 2. Condition for Measurements

Method Statement for Oil Storage Tanks Calibration Read More »

Civil Works Method Statements, Technical Articles
Bulldozer and Excavator Track Replacement Standard Procedure

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure

Below is the standard procedure that is helpful for project maintenance team for maintenance and track replacement for bulldozers and excavators. This instruction shall apply to all track replacement operations and other preventive maintenance actions for bulldozers, graders and excavators under the control of the contractor. General Requirements a) Clean the unit before service. b)

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure Read More »

Civil Works Method Statements, Roadworks
Scroll to Top