Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Repair of Painting Works on Beam, Column, Slabs, and Wall

The purpose of this method statement is to cover the steps for repairing of painting works on beam, column, slabs, and walls etc. Overall painting subcontractor is responsible for implementation of this procedure on a project or building. Below is list of necessary tools and equipment’s. Gondola for exterior works Water jet pump Scraper Paint […]

Repair of Painting Works on Beam, Column, Slabs, and Wall Read More »

Civil Works Method Statements

Download Method Statement For Application of Acrylic Rubber Filled Coating

Download Method Statement For Application of Acrylic Rubber Filled Coating  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files

Download Method Statement For Application of Acrylic Rubber Filled Coating Read More »

Civil Works Method Statements

Download Method Statement for Installation Of Curtain Wall & Glazing

Download Method Statement for Installation Of Curtain Wall & Glazing  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that

Download Method Statement for Installation Of Curtain Wall & Glazing Read More »

Civil Works Method Statements
soft landscaping method statement

Soft landscaping method statement

This method statement describes the procedures for Soft landscaping works which includes planting media, & Planting. Following equipment’s & materials shall be arranged before start of the work: Sweet soil Compost Fertilizers Plants Hand trowel Wheel barrow Tree stakes Tree ties Bobcat Shovel Crane Personal Protective Equipment: Safety Shoes Safety Helmets Hand Gloves Goggles Method Statement

Soft landscaping method statement Read More »

Civil Works Method Statements

Epoxy Painting Method

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages during the execution of Epoxy Painting Works at project site. The equipment/tools involved in painting works are listed below. Paint Brushes/Roller Paint Sprayers as required

Epoxy Painting Method Read More »

Civil Works Method Statements

Download Method Statement for Fabrication & Installation of Tensile Fabric Shades

Download Method Statement for Fabrication & Installation Of Tensile Fabric Shades  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list

Download Method Statement for Fabrication & Installation of Tensile Fabric Shades Read More »

Civil Works Method Statements

Download Method Statement for Screeding Works

Download Method Statement for Screeding Works  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included in

Download Method Statement for Screeding Works Read More »