Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Method Statement for Testing & Commissioning of Air Handling Units AHU & FAHU

This page presents precise mechanical method statement that covers ahu testing and commissioning procedure. A full method statement shall have many other sections and details depending upon the type and size of units and projects.  Prior to testing & commissioning ensure that all the sections of the Air Handling Units are thoroughly cleaned. In case […]

Method Statement for Testing & Commissioning of Air Handling Units AHU & FAHU Read More »

HVAC Method Statements, Testing & Commissioning

Chilled Water Pipe Insulation Method Statement

1. Purpose This method statement covers on site installation of thermal insulation for the complete chilled water piping system. 2. Scope This procedure is applicable for insulation of all supply and return mains, headers, branches, risers, drips, run-outs, pump suction and discharge, pipework, fittings, flanges, valves, expansion and movement devices, flexible connections associated with the

Chilled Water Pipe Insulation Method Statement Read More »

HVAC Method Statements
Motor Control Centre MCC Panel Installation Method Statement

Motor Control Centre MCC Panel Installation Method Statement

Below is a precise electrical method of statement for the installation of MCC panels. All components / materials received at site shall be inspected to ensure compliance with the approved material submittals and project electrical specifications Any discrepancies / damages shall be notified immediately for further action. Any factory test reports shall be checked and

Motor Control Centre MCC Panel Installation Method Statement Read More »

Electrical Method Statements
Method Statement for Wall Panel Installation

Method Statement for Wall Panel Installation

The purpose of this procedure is to define how the wall panel installation and fabrication at a construction site shall be carried out under the controlled conditions. Scope of work under this method statement covers the detailed procedure to be followed for fabrication, supply and installation of wall panels as per approved shop drawings and

Method Statement for Wall Panel Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Occupational Health and Safety Procedure for Chemicals and Hazardous Substances

Occupational Health and Safety Procedure for Chemicals and Hazardous Substances

Below is an important workplace health and safety procedure related to COSHH, that details the requirements for the establishment and maintenance of local registers for the control of chemicals and hazardous substances. Project head in coordination with all site staff and HSE team is overall responsible to implement this procedure on a project. Project Managers

Occupational Health and Safety Procedure for Chemicals and Hazardous Substances Read More »

Occupational Health and Safety
risk management

Risk Management Principles Simple & Precise Explanation

Risk management as understood by its name is process of managing the risks, that involves first identify, assess and prioritize the risks and then implement the coordinated measures and/or resources to eliminate, minimize and monitor the probability and impact of the unwanted events or situations. Risk management is the identification, evaluation, and prioritization of risks (defined in ISO 31000 as the

Risk Management Principles Simple & Precise Explanation Read More »

Occupational Health and Safety, Risk Assessment, Technical Articles

MV Switchgear Installation Method Statement

This method statement for installation of medium and low voltage switchgear and panels boards on site is prepared to define the method used to ensure that all MV/LV switchgear and panels site assembly, installation, final connection and workmanship is correct and acceptable and conforms to the contract documents & electrical specifications. The Project Manager is

MV Switchgear Installation Method Statement Read More »

Electrical Method Statements
Driven Piles Installation Method Statement

Driven Piles Installation Method Statement

The piling contractor shall submit to the consultant the piling forms and formats for approval prior to the commencement of piling works. Piling contractor shall maintain and provide all the record for each pile driven. Handling and Storage of Piles The piling contractor shall ensure that all piles are stacked correctly with timber being placed

Driven Piles Installation Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements