Download Method Statement for Installation of Reinforcing Bars

Download Method Statement for Installation of Reinforcing Bars  Download Package Contains the Method Statement + Checklists for Reinforcing bars + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are […]

Download Method Statement for Installation of Reinforcing Bars Read More »

Civil Works Method Statements

Drainage System Testing and Commissioning Method Statement

Below is the step wise procedure for Drainage System Testing and Commissioning. Below is list of necessary Instruments & Tools: Valve operating keys. Measuring Stick Plumbing Toolkit Pre-Commissioning Checks Before commissioning the drainage system the following shall be ensured. Installation and Leak testing of the pipes are completed. The installations of sanitary wares (WC, Wash

Drainage System Testing and Commissioning Method Statement Read More »

Plumbing Method Statements, Testing & Commissioning
SMDB MDB FDB Specifications

Download Method Statement For Installation of MDB, SMDB, DB, MCC & Capacitor Bank

Now you can Download Method Statement, ITP, Installation Checklists and Risk Assessment For Installation Of MDB SMDB DB MCC & CB by paying a very nominal fees.   The files are in word/excel format and instantly available after you pay the cost of only 2.99$.   You only need to change project name and insert logos etc

Download Method Statement For Installation of MDB, SMDB, DB, MCC & Capacitor Bank Read More »

Electrical Method Statements

Download Method Statement For Installation of Variable Air Volume VAV CAV

Now You can Download Method Statement, ITP, Installation Checklist and Risk Assessment For Variable Air Volume VAV Installation. The files are in word/excel format and instantly available. You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from clients. Below is a snapshot showing

Download Method Statement For Installation of Variable Air Volume VAV CAV Read More »

HVAC Method Statements

Download Method Statement For Installation of Air Curtains

Now You can Download Method Statement, ITP, Installation Checklist and Risk Assessment For Air Curtains Installation. You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from clients.   Below is a snapshot showing the content of the download package. Download Link:

Download Method Statement For Installation of Air Curtains Read More »

HVAC Method Statements
Method of Statement for Installation of Power / Electrical Bus bar

Download Bus Duct & Busbar Trunking System Installation Method Statement

Professional Method Statement for Bus Duct, Busbar Trunking Installation & QA/QC Documentation Looking for a complete and consultant-approved Bus Duct / Busbar Trunking System Installation Method Statement package? This professionally prepared documentation package is specially designed for electrical contractors, MEP companies, QA/QC engineers and project teams involved in installation of busbar trunking and bus duct

Download Bus Duct & Busbar Trunking System Installation Method Statement Read More »

Electrical Method Statements

Plunge Column Construction Method Statement

PURPOSE This Method Statement describes the construction process of 1500 mm diameter Plunge columns construction in the project. SCOPE OF WORK The scope of work and the construction sequence for installation of permanent plunge column shall be as mentioned below: Traffic Management and Barricading SHE Measures. Design and Drawings Site Establishment Surveying Pre-excavation Boring into

Plunge Column Construction Method Statement Read More »

Civil Works Method Statements