Author Archives: Web Master

Download Method Statement For Installation & Testing of Drainage Piping

Download Method Statement For Drainage Piping INSTALLATION & TESTING Now you can Download Method Statement, ITP, Installation Checklist, Leak Test Sheet and Risk Assessment For Drainage Piping Installation by paying a very nominal fees of $2.99. The files are in word/excel format and instantly available after you pay the cost of only 2.99$. You only need to change… Read More »

Method Statement for Application Of Bitumen Paint

Below is the systematic procedures for the various activities required for application of Bitumen Paint to ensure that all works are carried out in accordance with manufacturer’s recommendations. Arrange approved construction drawings and project specifications before start of the work. Surface Preparation Procedure: Surface shall be clean, dry and free from loose particles before application… Read More »

Room Integrity Test For Fire Suppression System FM-200 Inergen Vesda Novec

The objective of this document is to ensure that the room integrity tests in the 200 Bar gas fire extinguishing protected rooms are carried out correctly. FM200 room integrity test will ascertain, whether the room will retain the design concentration of the FM 200 or Inert fire suppression gas for a period of 10 minutes.… Read More »

Method Statement for Installation of Noise Control and Vibration Isolation Equipment

1. Purpose This method statement covers on site installation of noise control and vibration isolator equipment associated with all rotating, centrifugal and reciprocating equipment i.e. pumps, chillers, air handling units and pipe connections etc. 2. Scope of Work This procedure defines the stepwise method that will be used to ensure the correct installation of noise control… Read More »

Method Statement For Concrete Coring & Cutting

Before commencing any activity on site, the consultants must be notified. All the related documents, shop drawings, method of statements, material approvals, subcontractor’s approvals and test certificates etc. must be approved and readily available. Below mentioned tools and equipment shall be arranged. Cutting Machine – LP32/TS20 Coring Machine – DD 200/DD 350 Hand tools General… Read More »

Installation Procedure For Closed Control Units

The mechanical site engineer / site supervisor will give necessary instructions to tradesmen (pipe fitters & duct installers) and provide necessary approved construction/shop drawings of latest revision along with coordinated layouts for ccu installation works. Following tools shall be required before starting the CCU installation work: Pipe cutting & threading machines Standard mechanical Tool Box… Read More »

DOWNLOAD METHOD STATEMENT FOR TESTING & COMMISSIONING OF WATER BOOSTER PUMPS SET

Download Method Statement For TESTING & COMMISSIONING OF BOOSTER PUMPS Now you can Download Method Statement For Booster, Circulation or Filtration Pumps Testing & Commissioning including Pre-Commissioning and Commissioning Checklists The files are in word format and You only need to change project name and insert logos etc and the same shall be ready to… Read More »

TESTING & COMMISSIONING OF FIRE ALARM SYSTEM

Download Method Statement For TESTING & COMMISSIONING OF FIRE ALARM SYSTEM Now you can Download Method Statement For Fire Alarm System Testing & Commissioning including Pre-Commissioning and Commissioning Checklists The files are in word format and You only need to change project name and insert logos etc and the same shall be ready to be… Read More »