Below is precise civil work method statement that details general procedure to be followed for ceiling spray plaster works at any kind and size of project. The procedure includes preparatory works & method of ceiling spray application. Arrange below tools and equipment
Read Complete Method
Below is a standard method statement or procedure which can be used for installation of water chiller on its foundation after it is delivered on the sites. Before starting the activity of chiller installation following tools/equipment shall be arranged: Tool Box Lifting
Read Complete Method
You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be
Read Complete Method
The purpose of this method statement is to make sure that hydrostatic pressure testing of chilled water piping system is done safely as per client requirements and applicable mechanical standards. Method statement covers the hydrostatic testing of chilled water steel pipework at
Read Complete Method
This method statement is applicable for the testing and commissioning of hot water calorifier or water heater for any kind of building or projects. Arrange below tools before start of the work: Electrical Toolbox Box spanner set Pipe wrench Pre Commissioning Requirements
Read Complete Method
This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible
Read Complete Method
The purpose of this safety procedure is to provide instruction and direction as to what the correct usage of compressed air tools and equipment should be to minimize the risk of injury to personnel and assets. Below procedure is applicable for all
Read Complete Method
Below is the procedure for performing the sliding door/ aluminum door installation for any kind of building project. Before start of the sliding doors installation work, make sure the approval of material submittal and subcontractor / supplier. Ensure that shop drawings is
Read Complete Method