Web Master

Tensile Fabric Shades Fabrication and Installation Methodology

Below is a precise method statement that covers the fabrication and installation of fabric components of the tensile fabric shades that includes: Shades over outdoor playgrounds Shades over swimming pool Car park shades Fabric roof over cafeteria This procedure shall be read in conjunction with project specifications wherever applicable. Below is the equipment required for […]

Tensile Fabric Shades Fabrication and Installation Methodology Read More »

Civil Works Method Statements

Concrete Casting, Placement, Curing and Defect Rectification Method

Below is a brief method statement that describes the practices and methods with regards to concrete placing, curing and defect rectification. Below is list of reference documents useful for this method statement. Contract specification cast in place in concrete Hazard Analysis table Inspection and Test Plan BS 8110 Concrete Placement: Complete all quality control checks

Concrete Casting, Placement, Curing and Defect Rectification Method Read More »

Civil Works Method Statements
structured cabling system testing requirements

Structured Cabling System SCS Testing and Commissioning Requirements

Below are brief guidelines that can be followed or considered for testing & commissioning of structured cabling system including voice, telephone and data systems. Characterizing the cabling system provides useful data for the support of future equipment application. The verification of the transmission performance of cable through field measurements results in a more professional hand

Structured Cabling System SCS Testing and Commissioning Requirements Read More »

Technical Articles, Testing & Commissioning
Steel Bar Rebar Reinforcement Cutting and Bending Procedure

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the specific project contract documentation. In any circumstances where specifications are not provided or

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure Read More »

Civil Works Method Statements

Installation of Electrical Systems for HVAC Wild Air Cooling of Projects

This method statement details the method related to sequence of installation of electrical works in order to achieve the wild air cooling for under construction building of large projects. The installation of electrical works such as panel installation comprises the following activities. Site Clearance. Installation of necessary containment system. Area clearance for Electrical Room, Plant

Installation of Electrical Systems for HVAC Wild Air Cooling of Projects Read More »

HVAC Method Statements
Method Statement for Oil Storage Tanks Calibration

Method Statement for Oil Storage Tanks Calibration

Tank Calibration is the process of determining the volumetric content of a tank per unit height of liquid. This procedure shall be intended for calibration of Oil Storage Tanks. The calibration shall be carried out by Optical Reference Line Method (ORLM) in accordance with API Standards i.e.  API 2550, Section 2B and ISO 7507, Part 2. Condition for Measurements

Method Statement for Oil Storage Tanks Calibration Read More »

Civil Works Method Statements, Technical Articles
error: Content is protected !!
Scroll to Top