2019
Mar
31

Safety Procedures for GRP Pipeline Installation and Lamination

Below are detailed health and safety procedures for GRP pipeline installation and lamination works. The chemical components required for the butt-strap joints of GRP pipes present certain safety and health hazards if not handled well. Following are the recommendations: Common Hazards: Resin: Liquid

2019
Mar
27

Chemical Waste Disposal Method Statement

The purpose of this method statement is to ensure pollution free environment by proper disposal of chemical waste that are hazardous to health of personnel. The procedure is applicable to all personnel involved in processing of photosensitive film and handling of chemicals.

2019
Mar
25

Radiography Testing Works Safety Method Statement

radiography testing safety method statement

This document is for the use of employees and its subcontractors, who are responsible in operations of instruments using ionising radiation. This document covers specific instructions on how to safely perform radiography related task. Please note that this method is general and

2019
Mar
6

Safety Procedure for Erecting and Dismantling Concrete Formwork Systems

Concrete-Formwork-Installation-Method-Statement

This safe work method statement outlines conventional safety requirements for erecting and dismantling the vertical concrete forming systems. However, equipment and forming systems differ for different manufacturers and suppliers. Therefore reference must always be made to the instructions and procedures of the

2018
Dec
14

Temporary Electrical Supply HSE Procedure For Construction Site

Below procedure will help you to establish a safe standard for the installation of temporary and permanent electrical fixtures/appliances on project sites. Overhead Cables: Overhead supply from the supply point or metering point to the distribution boards on the site should be of