Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

irrigation-system-piping

Method Statement Irrigation Systems Piping

Only approved material shall be used. Delivered material shall be stored at stores and shall always be subject to client’s representative inspection. Special shaded pipe racks shall be constructed to store pipes. Fittings and irrigation materials shall be stored inside containers that will be kept closed at all times. Transportation: All materials will be transported to […]

Method Statement Irrigation Systems Piping Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Epoxy Painting Method

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages during the execution of Epoxy Painting Works at project site. The equipment/tools involved in painting works are listed below. Paint Brushes/Roller Paint Sprayers as required

Epoxy Painting Method Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Plunge Column Construction Method Statement

PURPOSE This Method Statement describes the construction process of 1500 mm diameter Plunge columns construction in the project. SCOPE OF WORK The scope of work and the construction sequence for installation of permanent plunge column shall be as mentioned below: Traffic Management and Barricading SHE Measures. Design and Drawings Site Establishment Surveying Pre-excavation Boring into

Plunge Column Construction Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Method of Statement for Traffic Diversion

This method statement introduces the proposed activities to be undertaken and acts as a general methodology for traffic diversion during road construction in the project site. This has been prepared to identify the work stages and the construction methodology for ensuring the works are carried out in compliance with contract requirements. This method statement describes

Method of Statement for Traffic Diversion Read More »

Civil Engineering Methods, Method Statements, Roadworks
Termite Control & treatment requirements

Standard Termite Control, Treatment and Application Requirements

This document covers termite control using approved insecticides executed in accordance with all applicable regulations in force in the country of project. Following documentation shall be submitted for the approval of consultant. Product Data: Treatments and application instructions Product Certificates: Signed by manufacturers of termite control products certifying that treatments furnished comply with requirements. Qualification

Standard Termite Control, Treatment and Application Requirements Read More »

Civil Engineering Methods, Method Statement for Civil Works
pebble washing method statement

Pebble Wash Do It Yourself

There are many advantages of doing the pebble wash i.e. it is natural material, thus soothing to your eyes. It will not fade and no need to apply paint forever. It is aesthetically beautiful and good for edging or contrast for flooring pattern. Below are the steps that are helpful for doing yourself the pebble

Pebble Wash Do It Yourself Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Method Statement for Oil Storage Tanks Calibration

Method Statement for Oil Storage Tanks Calibration

Tank Calibration is the process of determining the volumetric content of a tank per unit height of liquid. This procedure shall be intended for calibration of Oil Storage Tanks. The calibration shall be carried out by Optical Reference Line Method (ORLM) in accordance with API Standards i.e.  API 2550, Section 2B and ISO 7507, Part 2. Condition for Measurements

Method Statement for Oil Storage Tanks Calibration Read More »

Civil Engineering Methods, Method Statement for Civil Works, Technical Articles
Installation Method Statement for Settling Tank Shells Using Jack Lifting Method

Hydro and Water Fill Up Test for Settling Tanks

This test procedure shall be carried out to detect the leak in shell weld joints and to observe the load stabilization of liquid in interval level height. During the hydro test, all instrumentation shall be excluded to avoid the damage to instruments. Since the hydro test is to be carried out by produced water, ensure

Hydro and Water Fill Up Test for Settling Tanks Read More »

Civil Engineering Methods, Method Statement for Civil Works