Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Road Markings & Markers Method Statement

Below is a brief method statement for road markings and road signs. The method will ensure the quality of work in accordance with the contract requirements and applicable local standards. Following this road work method statement will also ensure that all quality assurance/ control activities are happening in a systematic manner. Arrange following materials and […]

Road Markings & Markers Method Statement Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements, Roadworks
asphalt paving method statement

Asphalt Paving Method Statement

Below asphalt paving method statement describes the responsibilities of personnel, execution procedure, safety factors and mandatory documents for the work. The overall responsibility lies with the project manager but specifically relevant function heads are responsible for controlling the asphalt paving work quality and applicable HSE requirements. Civil Contractor’s Safety Officer shall ensure that necessary work

Asphalt Paving Method Statement Read More »

Civil Engineering Methods, Method Statements, Roadworks
application heads for weld seam coating

Method Statement for Bituseal Enamel application

The Bituseal Enamel is based on a specially selected bitumen, modified with high performance engineering polymers. This polymer modification ensures improvements of a number of the product’s qualities, e.g. flexibility, adhesion and durability. Bituseal Enamel is supplied in different types/grades, depending on the varying requirements for corrosion protection materials for pipelines. The key factor in

Method Statement for Bituseal Enamel application Read More »

Civil Engineering Methods, Method Statement for Civil Works
Concrete-Formwork-Installation-Method-Statement

Safety Procedure for Erecting and Dismantling Concrete Formwork Systems

This safe work method statement outlines conventional safety requirements for erecting and dismantling the vertical concrete forming systems. However, equipment and forming systems differ for different manufacturers and suppliers. Therefore reference must always be made to the instructions and procedures of the particular manufacturer or supplier whose equipment is being used. Since field conditions vary

Safety Procedure for Erecting and Dismantling Concrete Formwork Systems Read More »

Civil Engineering Methods, Method Statements, Occupational Health and Safety
bulk earth work method statement

Method Statement for Bulk Earthworks

This Method Statement describes the works operation to undertake mass earthworks and sub grade construction that comply with the specified requirements for construction of new or widening of existing road under normal circumstances. The works covers all work in connection with the construction of cuts and fills including, Clearing and Grubbing, the removal to spoil

Method Statement for Bulk Earthworks Read More »

Civil Engineering Methods, Method Statement for Civil Works, Roadworks

Method Statement for Site Clearance Grubbing and Topsoil Removal

The purpose of this procedure is to outline the Site clearance, Grubbing and Topsoil removal. The detailed guide will provide the clear steps undertaken to complete the process of the site clearance activities in a safe, systematic and efficient manner in compliance to the statutory and environmental requirements. The procedure will include the removal and disposal of

Method Statement for Site Clearance Grubbing and Topsoil Removal Read More »

Civil Engineering Methods, Method Statement for Civil Works
soft landscaping method statement

Soft landscaping method statement

This method statement describes the procedures for Soft landscaping works which includes planting media, & Planting. Following equipment’s & materials shall be arranged before start of the work: Sweet soil Compost Fertilizers Plants Hand trowel Wheel barrow Tree stakes Tree ties Bobcat Shovel Crane Personal Protective Equipment: Safety Shoes Safety Helmets Hand Gloves Goggles Method Statement

Soft landscaping method statement Read More »