Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

distribution board testing procedure

Main Sub-Main Distribution Boards Testing and Commissioning Procedure

Method Statement For The Testing and Commissioning of Main Sub-Main Distribution Boards (MSMDB) Sub-Main Distribution Boards (SMDB) Distribution Boards (DB) and Consumer Units(CU) TESTING, COMMISSIONING AND START UP PROCEDURES Upon completion of equipment installation and prior to carrying out test runs, the Contractor shall visually inspect the installation and satisfy that the equipment has been […]

Main Sub-Main Distribution Boards Testing and Commissioning Procedure Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
main-distribution-board MDB Testing Procedure

Main Distribution Board MDB Testing & Commissioning Procedure

Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded in prescribed format. There are 3 cases to be considered. Case 1 is

Main Distribution Board MDB Testing & Commissioning Procedure Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves

These instructions relate only to Crane Gem rubber lined Butterfly valves, which are designed and manufactured to provide isolation, or can be used for regulation, of flow of suitable fluids. Valves must be installed into a well-designed system and it is recommended that the system be inspected in accordance with the appropriate member state legislation.

Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves Read More »

Plumbing Method Statements, Technical Articles
General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines

General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines

Following is a precise chemical cleaning procedure that will ensure the internal and external cleanliness and protection of the pipes before the piping process unit is put into service. Scope of work covers all the horizontal and vertical pipelines through all the areas in the project and buried underground lines in the infrastructure area as

General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines Read More »

HVAC Method Statements

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset

General Requirements Batteries, fuel & auxiliary power must be isolated before carrying out initial inspection. Ensure that the control switch is in the OFF position and emergency switch is pressed. Ensure that the panel has the correct fascia and labels. Note: All test sheets containing test values shall be forwarded to concern parties for records All

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
tig-welding-procedure

Types of Welding WPS, CWB Arc Welding Tig Welding

Before going to the welding procedure in full detail let’s first understand what is welding? The term welding is used in mechanical engineering when we are joining two or more pieces of any material typically metal by application of heat, pressure or combination of both. This is simplest definition for welding. Mostly the term is

Types of Welding WPS, CWB Arc Welding Tig Welding Read More »

HVAC Method Statements, Stainless Steel Fabrication

Welding Procedure | Arc Welding Machine

This welding procedure or Method statement describes in detail the welding process for pipe work and the welder’s qualification test procedures. This includes addressing programs for implementing commitments regarding the quality of welding works. Scope and Purpose This document outlines the method for executing welding procedure for pipe work and welding procedure qualification test for ARC Welder. This

Welding Procedure | Arc Welding Machine Read More »

HVAC Method Statements, Stainless Steel Fabrication
structured cabling system testing requirements

Structured Telephone & Data Cabling System Testing Requirements

All cables and termination hardware shall be 100% tested for defects in installation and to verify structured cabling system performance under installed conditions according to the requirements of ANSI/TIA 1152, ANSI/TIA-568 C.2 and IS&T. All pairs of each installed cable shall be verified prior to system acceptance. Any defect in the cabling system installation including

Structured Telephone & Data Cabling System Testing Requirements Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning