Piping Works

strainer installation method statement

Method Statement for Installation and Maintenance of Strainer

Strainers are installed to prevent foreign matter e.g. scale and dirt causing damage to pipeline equipment. Service temperature and pressure indicated on the identification plate or body marking should not be exceeded. Crane strainers have not been designed as fire safe pressure equipment. Strainers must be installed into a well-designed system and it is recommended […]

Method Statement for Installation and Maintenance of Strainer Read More »

Method Statements, Piping Works, Plumbing Method Statements

Condensate Water Filter Installation Method Statement

The Condensate Water Filter (Side Stream/ Multimedia) are compact filtration packages for the removal of grit, airborne particles and scale from cooling tower water in order to avoid system fouling. A licensed and/or trained/experienced plant electrician and millwright-pipe fitter should install this packaged system. Ensure that the concrete pad is level and structurally sound to

Condensate Water Filter Installation Method Statement Read More »

HVAC Method Statements, Method Statements, Piping Method Statements, Piping Works

Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves

These instructions relate only to Crane Gem rubber lined Butterfly valves, which are designed and manufactured to provide isolation, or can be used for regulation, of flow of suitable fluids. Valves must be installed into a well-designed system and it is recommended that the system be inspected in accordance with the appropriate member state legislation.

Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves Read More »

Piping Works, Technical Articles
General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines

General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines

Following is a precise chemical cleaning procedure that will ensure the internal and external cleanliness and protection of the pipes before the piping process unit is put into service. Scope of work covers all the horizontal and vertical pipelines through all the areas in the project and buried underground lines in the infrastructure area as

General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines Read More »

HVAC Method Statements, Piping Works

Welding Procedure | Arc Welding Machine

This welding procedure or Method statement describes in detail the welding process for pipe work and the welder’s qualification test procedures. This includes addressing programs for implementing commitments regarding the quality of welding works. Scope and Purpose This document outlines the method for executing welding procedure for pipe work and welding procedure qualification test for ARC Welder. This

Welding Procedure | Arc Welding Machine Read More »

Method Statements, Piping Works

Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings

Download Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings  Download Package Contains the Method Statement + Checklists for Installation + Checklists for Testing + Inspection & Testing Plan + Risk Assessment    You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval

Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings Read More »

Construction Method Statements, Download Method Statement, Method Statements, Piping Method Statements, Piping Works, Plumbing Downloads, Plumbing Method Statements, Pressure Testing

Download Method Statement For Testing & Commissioning of Laboratory Gas System

Download Method Statement For Testing & Commissioning of Laboratory Gas System  Download Package Contains the Method Statement + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list

Download Method Statement For Testing & Commissioning of Laboratory Gas System Read More »

Construction Method Statements, Download Method Statement, Method Statements, Piping Works, Plumbing Downloads, Plumbing Method Statements