Standby Diesel Generator Installation Instructions

standby diesel generator installation instruction

Before the installation of standby generator the equipment shall be inspected and checked against the relevant general arrangement drawing, approved material submittal. Doors and Panels shall be checked to ensure proper opening and closes. Generator rating, name plate details, Breaker ratings, protection

2018
Sep
11

Method Statement for PVC Electrical Conduit – PVC Pipe Installation

PVC Pipe & Conduit Installation

Plastic electrical pvc conduits are common item which is useful for electrical wiring using pvc pipe. Since these electrical conduits are not much stronger as compared to metallic GI conduits therefore need proper handling and storage. Plastic electrical conduit pipes while unloading

2018
Sep
8

Method Statement for Testing and Commissioning of Fire Alarm System

Fire alarm system testing and commissioning

Before starting the commissioning of Fire Alarm System, make sure that system installation is complete and approval is available. Verify the absence of unwanted voltage between circuit conductors and ground. Test all conductors for short circuits using an insulating testing device. With

2018
Mar
2

Method Statement for Mobilization of Diesel Generator Genset

Diesel-Generator-Genset Mobilization Method

Step 1: Electrical Circuit Isolation Isolate the main electrical connections and supply line from the gen-set. Cut off the main circuit breaker of the generator control panel to “stop”. Disconnect the electrical batteries connection from the genset. Disconnect the grounding cable from

2017
Nov
13

CCTV Camera Testing & Commissioning Procedure

Pan Tilt & Zoom or PTZ CCTV Camera

The purpose of this method statement is to specify the detailed requirements and procedure for testing & commissioning of installed CCTV System at a project in accordance to the specification and manufacture’s recommendation to reach the required quality and satisfying the requirements

2017
Jul
5

Car Parking Management System Testing Commissioning Procedure

Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be hard-wired. Please ensure full compliance with all applicable national and international rules and regulations concerning electric connections, as well as all applicable safety

2017
Jun
15

Lead Acid Batteries Installation Operating Maintenance Instructions