Author Archives: Web Master

Quality Management Procedure For Business Development – Sample

Below is a complete management procedure for business development, that can be used for any company by making little modifications. The procedure provides a basic structure for more inclusions depending upon the business type. Mostly marketing or business development departments are the owner of this procedure. Both departments are working collectively to achieve the business… Read More »

Testing & Commissioning Of Chilled Water Pumps

The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “ Chilled Water Pump” through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the… Read More »

Nitrogen Flushing of Air Conditioning and Refrigeration Systems

Below is the standard procedure for the proper flushing of air-conditioning and refrigeration system with the use of dry nitrogen, and refrigeration equipment which require flushing of the system after exposing it to the atmosphere or during replacement of the refrigerant compressor. Responsibilities: It is the responsibility of the A/C technician to conduct flushing of the system… Read More »

Method Statement For Copper Pipe Cutting & Jointing

The purpose of this method statement is to establish a standard procedure for the proper cutting  and jointing of copper pipe by using the right tools and procedure i.e. flaring or swaging joints. This will also serve as guideline for newly hired employee which will be dealing with Air-conditioning unit Maintenance activity or cutting of copper… Read More »

Testing & Commissioning Of Pressurization Unit – Chilled Water

1. Purpose The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of Pressurization Unit through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to satisfactory level. 2.… Read More »

Testing & Commissioning Of Fire Pumps

Fire Pump Testing and Commissioning Procedure The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “Fire Pumps” through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function… Read More »

Transformer Installation Method of Statement for any type of Project

This method statement explains and covers the transformer installation & inspection procedure of cast resin Transformers, although it is applicable for any other type as well. Transformer is used to transform the high voltage powers to low voltages, so that it is useful for domestic purpose. There are many types of transformers like oil type,… Read More »

Method Statement for PVC Wires Pulling & Termination

This work method statement explains and covers the wiring through conduits and its termination to the equipment / boards etc. Required Tools Pulling Rope Lubricant Markers Masking Tape Quality & Safety Requirements Quality control on site will be expedited through the project team using experienced supervisors and engineers checking their works and hold points approval… Read More »