Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Download Method Statement for Installation of Transformers

Download Method Statement for Installation  Of Transformers  Download package contains the Method Statement + Checklist for Installation + Inspection & Testing Plan + Quality Control Procedure QCP +  Risk Assessment   You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the […]

Download Method Statement for Installation of Transformers Read More »

Electrical Method Statements

Download Method Statement For Fire Alarm System Installation Testing & Commissioning

Download Method Statement For Fire Alarm System Installation Testing & Commissioning Download package contains Method Statement installation Checklist + Testing and Commissioning Checklists + Inspection & Test Plan ITP. The method statement & ITP are in Editable format and 11 number of checklists in pdf format which are instantly available after you pay the cost

Download Method Statement For Fire Alarm System Installation Testing & Commissioning Read More »

Electrical Method Statements, Testing & Commissioning
Bituminous coating waterproofing method statement

Method Statement for Bituminous Protective Coating Water Proofing

It is essential to water proof a structure to prevent the seepage or penetration of water for its durability. Water proofing is required for many areas like basements, sunken portions, roofs, terrace gardens and expansion joints etc.  Usually extensive waterproofing measures are added to a building at the time of construction, to provide moisture control

Method Statement for Bituminous Protective Coating Water Proofing Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Download Method Statement For Domestic Water Piping System & Water Tank Sterilization

Download Method Statement For Domestic Water Piping  System & Water Tank Sterilization  Download Package Contains the Method Statement + Checklist for Sterilization + Inspection & Testing Plan  You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are

Download Method Statement For Domestic Water Piping System & Water Tank Sterilization Read More »

Plumbing Method Statements

Download Method Statement for Installation & Testing of Vacuum System

Download Method Statement For Installation & Testing Of Vacuum System  Download Package Contains the Method Statement + Checklist for Installation + Checklist for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below

Download Method Statement for Installation & Testing of Vacuum System Read More »

Plumbing Method Statements, Testing & Commissioning

Download Method Statement For Installation, Testing & Commissioning of Wet Chemical Fire Suppression System For Kitchen Hoods

Method Statement For Installation, Testing & Commissioning Of Wet Chemical Fire Suppression System For Kitchen Hoods  Download Package Contains the Method Statement + Checklist for Installation + Checklist for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to

Download Method Statement For Installation, Testing & Commissioning of Wet Chemical Fire Suppression System For Kitchen Hoods Read More »

Fire Suppression System, Testing & Commissioning

Download Method Statement for Installation of Roof Drains, Funnel Floor Drains & Flower Bed Drains

Download Method Statement For Installation Of Roof Drains, Funnel Floor Drains & Flower Bed Drains  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below

Download Method Statement for Installation of Roof Drains, Funnel Floor Drains & Flower Bed Drains Read More »

Plumbing Method Statements

Download Method Statement for Testing & Commissioning of UPS System

Download Method Statement for Testing & Commissioning Of UPS System  Download package contains the Method Statement + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list

Download Method Statement for Testing & Commissioning of UPS System Read More »

Electrical Method Statements, Testing & Commissioning