Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Method Statement For Installation of Galvanized Wire Mesh/Screen

Method Statement For Installation of Galvanized Wire Mesh/Screen

The purpose of this procedure is to define how wire screen /mesh installation works shall be carried out under controlled condition. This Method Statement describes the steps that will be followed for the installation of galvanized mesh / screen as per the approved shop drawing details, this procedure shall be read in conjunction with contract […]

Method Statement For Installation of Galvanized Wire Mesh/Screen Read More »

Civil Works Method Statements
Pre Cast Water Tank Installation Method Statement

Pre Cast Water Tank Installation Method Statement

Below is a precise installation method statement for Pre Cast Water Tank. Project manager will oversee the whole project ensuring that people have the necessary information to perform their job roles. Construction manager will ensure that the relevant department is aware of and understands the requirements of this Method Statement. He will ensure all relevant

Pre Cast Water Tank Installation Method Statement Read More »

Civil Works Method Statements
Piling Cage Installation

Method Statement for Pile Reinforcement and Concrete Casting

Subsequent to the completion of the pile drilling, the borehole depth will be checked and verified versus the depth given on daily piling sequence and pile data.  Only after borehole depth check can the cage be lowered into the borehole.  A reference site datum level will be given to ensure the correct positioning of the

Method Statement for Pile Reinforcement and Concrete Casting Read More »

Civil Works Method Statements

Download Method Statement for Wall Panels Installation

Download Method Statement for Wall Panels Installation  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included

Download Method Statement for Wall Panels Installation Read More »

Civil Works Method Statements
Inspection and Test Requirements for In-Situ Concrete Placement

Inspection and Test Requirements for In-Situ Concrete Placement

This procedure covers checks and quality control requirements for carrying out in-situ concrete operations. Daily concrete requirements shall be provided to the RMC supplier including quantity, mix  details, workability time, delivery rate and access arrangements. Site Engineer shall ensure that checks on the following activities take place using checklist for In-Situ Reinforced Concrete. Formwork Requirements

Inspection and Test Requirements for In-Situ Concrete Placement Read More »

Civil Works Method Statements
Pedestrian Walkway Concreting - Broom Finish Concrete

Pedestrian Walkway Concreting – Broom Finish Concrete

The purpose of this concreting method statement is to define the guidelines for the preparation of the concreting work for pedestrian walkway (broom finish) and to ensure the safe execution of all the concrete works during construction phases of the project so as to eliminate the risk of injury or damage to personnel, equipment and

Pedestrian Walkway Concreting – Broom Finish Concrete Read More »