Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Flushing Procedure For Chilled Water System

Flushing Procedure For Chilled Water System & Chemical Treatment

Chilled water or cooling water system is mostly a closed system that requires strict monitoring and control of certain parameters. Water during circulation evaporates and it increases the suspended particle concentration, which in result creates scale formation and corrosion etc. Therefore the chemical treatment of any water system is very much necessary on regular basis. […]

Flushing Procedure For Chilled Water System & Chemical Treatment Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
Chilled Water Pressurization Unit Testing and Commissioning Method Statement

Chilled Water Pressurization Unit Testing and Commissioning Method Statement

The purpose of this procedure is to define the step by step method to implement the correct practices for the pre commissioning & commissioning of chilled water pressurization unit. By following this method statement contractor shall ensure that pressurization unit installation and testing works comply with the project requirements/specifications and serves the intended function to

Chilled Water Pressurization Unit Testing and Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
Installation of Air Handling Units AHU & FAHU

Method Statement for Installation Of Air Handling Unit AHU & FAHU

Below is the brief method of statement for the installation of air handling unit which is applicable for both AHU & FAHU installation. On this page we have given in detail only one section of overall method statement that covers mainly installation and inspection part. Complete method statement shall include other sections as well as

Method Statement for Installation Of Air Handling Unit AHU & FAHU Read More »

HVAC Method Statements, Method Statements
UPS Installation and Testing Method Statement

UPS Installation Testing and Commissioning Method Statement

The purpose of this method statement is to define the procedure for Installation, Testing  and Commissioning of UPS. Also to ensure that agreed  procedures are implemented during execution of the previously described or associated work. Scope of this method statement covers material handling, installation procedure and necessary occupational health and safety precautions. This document applies

UPS Installation Testing and Commissioning Method Statement Read More »

Electrical Method Statements, Testing & Commissioning
Method Statement for Split AC Installation of DX Split Units & Packaged Units

Air Conditioner Installation Method Statement for Split Unit

Below is the a detailed ac installation method statement covering the installation of DX type split unit and packaged unit including the installation of outdoor units. All the split ac installation inspection and testing works shall be carried out in accordance with the project specifications and manufacturer’s installation instructions. AC installation works for split unit

Air Conditioner Installation Method Statement for Split Unit Read More »

HVAC Method Statements, Method Statements

Chilled Water Pump Testing Commissioning Checklist

The pump operation is controlled as per the chilled water or cooling requirements and sequence of operation is automated via field control devices i.e. valves, thermometers and pressure switches etc. Pump sets are supplied mounted on a substantial fabricated base plate; the complete assembly is of a rigid construction, being intended for mounting on suitable

Chilled Water Pump Testing Commissioning Checklist Read More »

HVAC Method Statements, Testing & Commissioning
water-heater-installation-method-statement

Method Statement for Installation of Electric Water Heater

The procedures for the installation and fixing of electric water heater with supports and accessories shall be done as per the manufacturer’s recommended guidelines and installation instructions and as per the approved water supply drawings/layouts and detailed drawing as follows. This method statement for installation of electric water heater must be changed as per site

Method Statement for Installation of Electric Water Heater Read More »

Method Statements, Plumbing Method Statements
Method Statement For Switchgear Installation Of MV LV HV Switchgear Panels

Switchgear Installation Method Statement for MV LV HV Switchgear Panels

The purpose of generating this electrical method statement is to define the switchgear installation procedure step by step. By implementing the correct practices for medium voltage switchgear panel installation & its accessories as per the guidelines contained herein, contractor can ensure that the job execution complies with project specifications and serves the intended function to

Switchgear Installation Method Statement for MV LV HV Switchgear Panels Read More »

Electrical Method Statements