Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Vacuum System Testing & Commissioning Procedure

This method statement covers all processes related to the testing and commissioning of laboratory or hospital vacuum system. Implementation of this method statement requires reference to other relevant documents like inspection and testing plan outlining the responsibility and the quality verification to be performed by various parties. Other references include: Latest Approved shop drawings for […]

Vacuum System Testing & Commissioning Procedure Read More »

Method Statements, Plumbing Method Statements, Testing & Commissioning
SMDB MDB FDB Specifications

MDB, SMDB, DB, MCC & Capacitor Bank Installation Method Statement

The purpose of generating this method statement is to implement the correct practices for the installation of main distribution board MDB, Sub main distribution boar SMDB, distribution board DB, Motor Control Center MCC and capacitor bank. By following the guidelines contained herein the installation team shall ensure that the job execution complies with project specifications

MDB, SMDB, DB, MCC & Capacitor Bank Installation Method Statement Read More »

Electrical Method Statements, Method Statements

Download Method Statement for Installation of Fan Coil Units FCU’s

Download Method Statement for Installation Of  Fan Coil Units FCU’s Download package contains the Method Statement + Checklist for Installation  + Inspection & Testing Plan + Risk Assessment.   You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of

Download Method Statement for Installation of Fan Coil Units FCU’s Read More »

HVAC Method Statements

Download Method Statement for Installation and Pressure Testing of Chilled Water Piping & Accessories

Download Method Statement for  Installation and Hydro Pressure Testing Of Chilled Water Piping & Accessories Download package contains the Method Statement + Checklist for Installation + Checklist for Pressure Testing + Inspection & Testing Plan +  Risk Assessment   You only need to change project name and insert logos etc and the same shall be ready to be submitted

Download Method Statement for Installation and Pressure Testing of Chilled Water Piping & Accessories Read More »

HVAC Method Statements

Download Method Statement For Testing & Commissioning of Transformers

Download Method Statement For Testing & Commissioning of Transformers Now you can Download Method Statement For Transformer Testing   Download package contains the Method Statement + Checklist for Testing + Inspection & Testing Plan + Risk Assessment.   You only need to change project name and insert logos etc and the same shall be ready to be submitted for

Download Method Statement For Testing & Commissioning of Transformers Read More »

Electrical Method Statements, Testing & Commissioning

Download Method Statement For Compressed Air System Piping Installation

Download Method Statement For INSTALLATION & TESTING OF COMPRESSED AIR SYSTEM Now you can Download Method Statement, ITP, Installation & Pressure Test Checklists and Risk Assessment For Compressed Air System Piping Installation by paying a very nominal fees. The files are in word/excel format and instantly available after you pay the cost of only 2.99$. You

Download Method Statement For Compressed Air System Piping Installation Read More »

Plumbing Method Statements

Download Method Statement for Installation of Lightning Protection System

Download Method Statement for Installation of Lightning Protection System Including Earth Pits  Download package contains the Method Statement + Checklist for Installation + Earth Pit Test Certificate + Inspection & Testing Plan + Quality Control Procedure QCP +  Risk Assessment   You only need to change project name and insert logos etc and the same shall be ready to

Download Method Statement for Installation of Lightning Protection System Read More »

Electrical Method Statements

How To Make Crimping Joints for Cables & Wires? [Answered]

This document describes the procedure of jointing of wires in the project, and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in compliance with applicable Safety and Quality Procedures, and Project Documents and Specification. Following equipment and tools shall be arranged: Tool

How To Make Crimping Joints for Cables & Wires? [Answered] Read More »

Construction Method Statements, Electrical Method Statements, Method Statements