2015
Feb
16

Installation Method Statement For Pre Cast Water Tank

Roles and Responsibilities: Project Manager   will oversee the whole project ensuring that people have the necessary   information to perform their Job Roles. Construction Manager will ensure that the relevant department is aware of and understands the requirements of this Method Statement.  He

2015
Jan
3

Method Statement for Screeding / Topping Above & Below Tiling In Toilet Roof or Raft Slab

Method Statement For Screeding Topping Above & Below Tiling In Toilet Roof or Raft Slab

This method statement covers the detailed procedure to be followed for screeds/topping operation above water proofing in toilet, roof slab and raft slab. Method statement also covers the screeding operation below tiling works in concrete slabs wherever necessary. This floor screeding procedure

2014
Dec
15

Download Method Statement For Plastering Works

Download Method Statement For Plastering Works Now you can Download Method Statement, ITP, Checklist and Risk Assessment For Plastering work. You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from

2014
Dec
13

Download Method Statement For Painting Works – External

Download Method Statement For Painting Works – External Now you can Download Method Statement, ITP, Painting Checklist and Risk Assessment For Painting Works by paying a very nominal fees. The files are in word/excel format and instantly available after you pay the

2014
Dec
2

Download Method Statement for Concrete Works Sub Structure

Download Method Statement For Concrete Works Sub Structure Now you can Download Method Statement, ITP, Checklists and Risk Assessment For Concrete Works Sub Structure by paying a very nominal fees. The files are in Word format and instantly available after you pay the

2014
Nov
28

Method Statement for Water Proofing Self Adhesive Membrane

self-adhesive-water-proofing-membrane

Below is a precise method statement for water proofing works using self adhesive membrane materials from any brand. Following equipment and tools shall be required before starting the water proofing work. Slow speed drill machine Gas Cylinders Hand Tools & PPE Trowel

2014
Aug
13

Method Statement For Concrete Coring & Cutting

Before commencing any activity on site, the consultants must be notified. All the related documents, shop drawings, method of statements, material approvals, subcontractor’s approvals and test certificates etc. must be approved and readily available. Below mentioned tools and equipment shall be arranged.

2014
Aug
13

Aluminum Sliding Doors Installation Method of Statement

Method Statement For Installation Of Automatic Aluminium Sliding Door

Below is the procedure for performing the sliding door/ aluminum door installation for any kind of building project. Before start of the sliding doors installation work, make sure the approval of material submittal and subcontractor / supplier. Ensure that shop drawings is

error: Content is protected !!