Water Spray Firefighting System Installation Method Statement

Below you can find steps for installing the water spray firefighting and fire suppression system. The method statement covers all necessary parts and accessories for the spray system. Following tools shall be arranged before starting the job:

PROCEDURE OF SPRAY SYSTEM INSTALLATION WORKS

GI PIPE PAINTING

DROP IN ANCHOR INSTALLATION

GROOVING PROCEDURE

THREADING PROCEDURE

PIPE HANGER INSTALLATION

PIPE INSTALLATION

COUPLING INSTALLATION

MECHANICAL-T INSTALLATION

FLANGE FITTING INSTALLATION

VALVE WITH SCREW CONNECTION INSTALLATION

VALVE WITH FLANGE END CONNECTION INSTALLATION

SCREW FITTING INSTALLATION

INSTALLATION OF MECHANICAL ITEMS

The Deluge valve shall be installed in accordance with the following instructions.  Proper operation depends upon it being installed in accordance with the instructions given below.  Failure to follow these instructions may prevent the devices from functioning properly as well as void listings, approvals, and the manufacturer’s warranties.

INSTALLATION OF ELECTRICAL ITEMS